My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH METRO EAST MIXED USE OVERLAY (MEMU)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
75A - PH METRO EAST MIXED USE OVERLAY (MEMU)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:48:05 PM
Creation date
8/30/2018 7:27:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
9/4/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GPA No. 2018-3, AA No.2018-6, ZOA No. 2018-3, and SPR No. 2018-02 Metro East Mixed_ Use <br />(MEMU) Overlay Zone and Elan projects <br />July 23, 2018 <br />Page 9 <br />courtyard will be surrounded by an artist gallery, leasing office, and other community amenities. <br />Additional open space on site will serve the residents and tenants within the community. Amenity <br />rooms, decks and balconies, two pool areas and private courtyards, and view rooms will meet or <br />exceed the.present and proposed (amended) MEMU standards. <br />The project's landscape palette has been selected to match and complement the Santa Ana Zoo <br />that lies to the east of the project site across Elk Lane. The project frontage will also be improved <br />with unique lighting and street furniture to match the Santa Ana Zoo. The applicant has <br />coordinated the landscape plan with the Public Works and Parks, Recreation ;and Community <br />Services agencies. <br />Elan will feature a contemporary architectural style with Mid-century modem elements. Building <br />materials are designed to mimic or complement the natural environment, with generous use of <br />horizontal elements and carefully -placed vertical emphases, angles, metal brows, and fiber cement <br />siding resembling wood, wood railings, glass, concrete, and cement blocks. The project's defining <br />architectural features are the 24 -foot high ceilings for the commercial component and the full - <br />height illuminated Window Wall along First Street. All utilities, loading, and move -ins will be <br />contained within the building, and all parking (subterranean or above -ground structure) will be <br />concealed from view from both the public and from within the project. The contemporary style also <br />incorporates influences commemorating the Elks Lodge and Saddleback Inn. <br />As part of the project, the applicant has proposed a full reconstruction of Elk Lane between First <br />Street and Chestnut Avenue. The improvements are voluntary and have been coordinated with the <br />Planning and Building, Public Works, and Parks, Recreation and Community Services agencies. <br />Improvements include undulating sidewalk patterns on the project site, sidewalk improvements on <br />the zoo (east) side of Elk Lane, and new bulb -outs and crosswalks on both sides of Elk Lane. The <br />applicant has committed to constructing the new street, sidewalks, curbs, parking, and gutters, and <br />will landscape both sides of Elk Lane, with the City assuming the long-term responsibility of <br />maintenance through a maintenance agreement. These improvements have been designed to <br />take into account the new Zoo Master Plan, adopted in March 2018. In addition to the <br />improvements to Elk Lane, the project will require reconstruction of sidewalks, curbs, and gutters <br />along First and Lyon streets. Portions of all streets along the project's frontage (Elk Lane.and First <br />and Lyon streets) will also be repaved. The project will be conditioned to require continued <br />coordination among the Planning .and Building, Public Works, and Parks, Recreation and <br />Community Services agencies to identify opportunities for street art, signage, and other <br />installations to complement the Santa Ana Zoo. <br />The commercial component on First Street and the live/work units' ground -floor shopkeeper <br />spaces have been designed to accommodate a wide range of tenants and ,to be expanded if <br />market conditions warrant. The First Street commercial space has been designed with full two` - <br />story volumes, enabling the square footage to be doubled within to over 16;000 square feet. This. <br />square footage can accommodate half a dozen smaller tenants, a large pharmacy, or <br />neighborhood market and cafe. The design and success of the commercial spaces are intended to <br />75A-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.