Laserfiche WebLink
document. The City provided written `responses to all agencies and <br />members of the public commenting; on the draft SEIR at least 10 <br />days prior.to the City Council hearing. <br />9. The City has prepared a Final SEIR, consisting of comments and <br />recommendations received during the 45 -day public review and <br />comment period, written responses to those comments, and <br />revisions and clarifications to the draft SEIR in response to those <br />comments. For the purposes of this Resolution, the SEIR shall refer <br />to the draft ,SEIR, including all of the technical studies and <br />appendices to the draft SEIR, as revised by the Final SEIR's <br />revisions, together with the other sections of the .Final SEIR, <br />including all of the technical studies, attachments, and appendices <br />-to the Final SEIR. <br />10. Findings of Fact with respect to environmental impacts, including <br />environmental impacts identified in the Final SEIR as potentially <br />significant, but which the City finds can be substantially lessened <br />through the imposition of feasible mitigation measures identified in <br />the Final SIER, are described in Exhibit A attached hereto and <br />incorporated herein by this reference. <br />11. As a result of the environmental analysis in the SEIR, one <br />significant impact was found from the construction of the proposed <br />project that pertains to loss of an eligible historic resource. <br />Accordingly, the City has also prepared a Statement of Overriding <br />Considerations in compliance with Public Resources Code Sections <br />21081 and CEQA Guidelines Section 15093, which finds that <br />specific economic, legal, social, technological, or other benefits of <br />the proposed .project outweigh the significant and unavoidable <br />impacts identified ;in the EIR, as described in Exhibit B attached <br />hereto and Incorporated herein by this reference. <br />12. Mitigation measures have been provided to address potential <br />environmental impacts, with a list -of these mitigation measures <br />found within the attached Mitigation Monitoring and Reporting <br />Program (MMRP) attached hereto as. Exhibit C and incorporated <br />herein by this reference. Mitigation measures have been outlined <br />to address potential impacts stemming from adoption of the original <br />MEMU EIR and the 2018 MEMU expansion and amendments <br />project's SEIR. <br />Resolution No. 2018-xx <br />75A-21 <br />