My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH METRO EAST MIXED USE OVERLAY (MEMU)
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
75A - PH METRO EAST MIXED USE OVERLAY (MEMU)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 7:48:05 PM
Creation date
8/30/2018 7:27:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75A
Date
9/4/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GPA No. 2018-3, AA No.2018-6,, ZOA No. 2018-3, and SPR No. 2618-02 Metro East Mixed Use <br />(MEMU) Overlay Zone and Elan projects <br />July 23,2018 <br />Page 5 <br />Table 1: S mdry of MEMU Overlay Zone Amendments, <br />Amendment <br />Issues and ,Impact <br />Development Standard. <br />Issue: Currently the MEMU requires 100 square feet of <br />Reduce private/public open <br />private/common open space required per unit in the Neighborhood <br />space requirement to 90 square <br />Transitional, Village Center, and Active Urban land use districts. In <br />feet per unit. <br />other City form -based codes the standard is 90 square feet per unit. <br />Amendment Impact: Amends the MEMU open space standards to <br />be consistent with other Santa Ana form -based code areas, including <br />the Harbor Plan and Transit Zoning Code. <br />Development Standard. Amend <br />Issue: Building setbacks are prescribed depending on land use <br />setback standards to be <br />district and by yards (front, side, rear, etc.). Rear -yard setbacks for <br />consistent with those contained in <br />buildings over three and ten stories are 100 feet and 150 feet, <br />the Harbor Plan, which prescribe <br />respectively, resulting in disproportionately-laege rear yard areas <br />setbacks based on relation to the <br />becoming undevelopable. <br />street and surrounding land uses. <br />Amendment Impact: Amends the MEMU setback standards to be <br />consistent with the Harbor Plan. For developments adjacent to <br />residential land uses, the property line setback proposed is 15 feet <br />(up to the 2ctl floor), 20 feet (up to the 6r' floor), and 30 feet (Ph floor <br />and above). This amendment will reduce the number of variance <br />and/or density bonus incentives/concessions and waiver requests. <br />Development Standard. Amend <br />Issue: Neighborhood Transitional and Office land use districts allow <br />allowable height in the <br />buildings up to 3 and 6 stories, respectively, which do not match <br />Neighborhood Transitional and <br />current market demands and increases in real estate values and <br />Office land use districts to allow <br />costs. <br />buildings up to 4 and 10 stories, <br />respectively. <br />Amendment Impact: Amends building height standards to be <br />consistent with other Santa Ana form -based code areas, including <br />the Harbor Plan and Transit Zoning Code while respecting sensitive <br />land uses that may be nearby. This amendment will reduce the <br />number of variance and/or density bonus incentives/concessions and <br />waiver requests. <br />Elan Mixed -Use Development <br />The SAMC and MEMU Overlay Zone require that the Planning Commission review a site plan <br />review application for any project proposed within an overlay zone that is built to the overlay <br />zone's standards. The Elan project site is currently located in the General Commercial (C-2) and <br />Multiple. -Family Residence (R-3) zoning districts. However, because the City is proposing to <br />apply the OZ -1 designation to the project site, Planning Commission approval of a site plan <br />review application is required in order for the project to materialize. Staff will draft the Elan <br />75A-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.