My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
65A - JAIL REUSE STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/04/2018
>
65A - JAIL REUSE STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2018 8:08:08 PM
Creation date
8/30/2018 8:03:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
City Manager's Office
Item #
65A
Date
9/4/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
218
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Fiscal Analvsis: A construction cost analysis was also developed which included <br />detailed expenditure information showing the overall fiscal impact the City would <br />likely incur if each jail reuse option was pursued through construction and ultimately <br />implemented. The construction cost analysis included a summary conceptual cost <br />statement showing building construction and project costs associated with each of <br />the five jail reuse options. The information covered cost factors that included (a) <br />estimated range of building design changes; (b) escalated construction costs; and (c) <br />other project -related expenses. <br />The following Statement of Probable Construction and Project Costs reflects the <br />consultant team's estimate of the total cost that will be required to convert the Santa <br />Ana City Jail to a commercial office complex from which leased space would be <br />available for general office environment functions. The conversion to office usage <br />would involve the renovation and modification of the four level building containing <br />168,243 square feet of space. As the analysis and cost estimate shows the <br />renovation work and base construction with estimates for construction contingencies, <br />and project costs for A/E fees, CM inspections, and FF&E expense will amount to <br />$23,015,707. The base construction cost, with general contractor overhead, bonds, <br />profit and placeholders for design contingencies and market factors is estimated at <br />$16,923,427 which amounts to a cost of approximately $100 a square foot. <br />Expenditure Category I Estimated Cost <br />Base Construction <br />$ <br />11,482,287 <br />General Contractor Overhead & Profit <br />$ <br />1,148,229 <br />General Contractor Markups <br />$ <br />631,526 <br />General Contractor Bonds <br />$ <br />298,396 <br />Design Contingency <br />$ <br />2,712,088 <br />Market Factor <br />$ <br />650,901 <br />Sub -Total <br />$ <br />16,923,427 <br />Construction Contingency (10%) <br />$ <br />1,692,300 <br />A/ E Fees (10%) <br />$ <br />1,692,300 <br />CM Inspection (4%) <br />$ <br />676,920 <br />Miscellaneous (2%) <br />$ <br />.338,460 <br />FF&E (10%) <br />$ <br />1,692,300 <br />Sub -Total <br />$ <br />6,092,280 <br />Total <br />$ <br />23,015,707 <br />(See Appendix E: Santa Ana City Jail Reuse Options Detailed Construction <br />and Project Cost Estimates) <br />Potential Return on Investment <br />We conducted a search for private or co -work offices / workspace facilities such as <br />Regus, Target, and We -Works in the Santa Ana Area. Our research shows office <br />space facilities are available in nearby Anaheim, Costa Mesa, Irvine, and Orange, but <br />not in Santa Ana. One selling point these organizations are using is their fast access <br />92 <br />65A-99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.