My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EASTCOM CORP
Clerk
>
Contracts / Agreements
>
E
>
EASTCOM CORP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 12:10:55 PM
Creation date
9/4/2018 11:59:20 AM
Metadata
Fields
Template:
Contracts
Company Name
EASTCOM CORP
Contract #
N-2018-162
Agency
Planning & Building
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A, Puree <br />MAYOR PRO TEM <br />Michele Martinez <br />COUNCILMEMBERS <br />P. David Benavides <br />Vicente F. Sarmiento <br />Jose Solorio <br />Sal Tinajero <br />Juan Villegas <br />August 2, 2018 <br />Mr. Michael I lurrah <br />Eastcorn Corp. <br />1103 N. Broadway <br />Santa Ana, CA 92701 <br />EXHIBIT C <br />I TY OF SANTA /'iNA <br />PLANNING & BUILDING AGENCY <br />20 Civic Center Plaza <br />P.O. [Sox 1958 - Santa Ana, California 92702 <br />www.santa-ana.org/plea <br />CI IY MANAGER <br />Raul Godinez II <br />CITY ATTORNEY <br />Sonia R. Canialho <br />CLERIC OF THE COUNCIL <br />Maria D. Huizar <br />RE: Seismic Retrofit Alternate Mcthods and Materials application for 888 N. Main Street <br />(Application Number 10196597) <br />bir. Harrah: <br />Thank you for the Alternate Materials and Methods application that formally submitted on <br />May 31, 2018 including the Memorandum by Mr. Leonard Joseph of Thornton Tomasetti <br />dated May 21, 2018, Based on the piemorandurn and supporting testing information we feel <br />that the application meets the intent of the Citys Adaptive Reuse Ordinance for seismic <br />retrofit based on the performance based design methodology of ASCE =41-13. <br />The seismic retrofit design is in the construction drawings phase with working drawing being <br />prepared by Thornton Tomasetti. The target building performance levels that have been <br />presented are acceptable and will be the basis of our review for this project. <br />Please note that an independent peer reviewer shalt be required and shall be part of' the <br />review process for this project now that the design criteria has been accepted. David Choi <br />and Associates has been accepted as the peer reviewer and are cun-ently reviewing the <br />project. <br />The seismic retrofit construction documents shall be submitted as a separate permit <br />application once they are finalized. <br />Sincerely, <br />Ocratld Caraig, PL, CBO, CASA <br />Build!i'rtg Safety Manager,' Building Official <br />SANTA AMA CITY COUNCIL <br />klkp, e. A P,d 0", <br />kllcre:M Yln,tinen <br />vicenla F 5110111enw Jbse s<� P Wvi,1 eanam,l=s <br />Juan r/ llagas <br />'sal fi,a:era <br />mayYx <br />myP rv, W.,d2 <br />NiJ. WAm3 N rl. <br />Na,l <br />Wl,di <br />-� t71ShcS- <br />
The URL can be used to link to this page
Your browser does not support the video tag.