Laserfiche WebLink
HCM 2010 TWSC <br />5: East Project Dwy & Alton Ave 09/15/2017 <br />Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 01 Existing AM Synchro 9 Report <br />LSA Analyst AY Page 2 <br />Intersection <br />Int Delay, s/veh 0 <br />Movement EBT EBR WBL WBT NBL NBR <br />Lane Configurations <br />Traffic Vol, veh/h 888 10 0 337 0 0 <br />Future Vol, veh/h 888 10 0 337 0 0 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Free Free Free Free Stop Stop <br />RT Channelized - None - None - None <br />Storage Length - - - - - 0 <br />Veh in Median Storage, # 0 - - 0 0 - <br />Grade, % 0 - - 0 0 - <br />Peak Hour Factor 79 79 79 79 79 79 <br />Heavy Vehicles, % 2 2 2 2 2 2 <br />Mvmt Flow 1124 13 0 427 0 0 <br /> <br />Major/Minor Major1 Major2 Minor1 <br />Conflicting Flow All 0 0 - - - 568 <br /> Stage 1 - - - - - - <br /> Stage 2 - - - - - - <br />Critical Hdwy - - - - - 6.94 <br />Critical Hdwy Stg 1 - - - - - - <br />Critical Hdwy Stg 2 - - - - - - <br />Follow-up Hdwy - - - - - 3.32 <br />Pot Cap-1 Maneuver - - 0 - 0 466 <br /> Stage 1 - - 0 - 0 - <br /> Stage 2 - - 0 - 0 - <br />Platoon blocked, % - -- <br />Mov Cap-1 Maneuver - - - - - 466 <br />Mov Cap-2 Maneuver - - - - - - <br /> Stage 1 - - - - - - <br /> Stage 2 - - - - - - <br /> <br />Approach EB WB NB <br />HCM Control Delay, s 0 0 0 <br />HCM LOS A <br /> <br />Minor Lane/Major Mvmt NBLn1 EBT EBR WBT <br />Capacity (veh/h)- - - - <br />HCM Lane V/C Ratio - - - - <br />HCM Control Delay (s) 0 - - - <br />HCM Lane LOS A - - - <br />HCM 95th %tile Q(veh) - - - - <br />3-83