Laserfiche WebLink
HCM 2010 TWSC <br />2: Jaguar Way/Project Dwy & School Dwy 09/15/2017 <br />Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project AM Synchro 9 Report <br />LSA Analyst AY Page 1 <br />Intersection <br />Int Delay, s/veh 10.3 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 0 365 510 0 0 0 <br />Future Vol, veh/h 0 365 510 0 0 0 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - None - None - None <br />Storage Length 0 - - - - - <br />Veh in Median Storage, # 0 - - 0 0 - <br />Grade, % 0 - - 0 0 - <br />Peak Hour Factor 66 66 66 66 66 66 <br />Heavy Vehicles, % 2 2 2 2 2 2 <br />Mvmt Flow 0 553 773 0 0 0 <br /> <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 1547 2 2 0 - 0 <br /> Stage 1 2 - - - - - <br /> Stage 2 1545 - - - - - <br />Critical Hdwy 6.42 6.22 4.12 - - - <br />Critical Hdwy Stg 1 5.42 - - - - - <br />Critical Hdwy Stg 2 5.42 - - - - - <br />Follow-up Hdwy 3.518 3.318 2.218 - - - <br />Pot Cap-1 Maneuver 126 1082 1620 - - - <br /> Stage 1 1021 - - - - - <br /> Stage 2 194 - - - - - <br />Platoon blocked, % - - - <br />Mov Cap-1 Maneuver 66 1082 1620 - - - <br />Mov Cap-2 Maneuver 66 - - - - - <br /> Stage 1 1021 - - - - - <br /> Stage 2 101 - - - - - <br /> <br />Approach EB NB SB <br />HCM Control Delay, s 11.8 9.2 0 <br />HCM LOS B <br /> <br />Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR <br />Capacity (veh/h)1620 - 1082 - - <br />HCM Lane V/C Ratio 0.477 - 0.511 - - <br />HCM Control Delay (s) 9.2 0 11.8 - - <br />HCM Lane LOS A A B - - <br />HCM 95th %tile Q(veh) 2.7 - 3 - - <br />3-93