Laserfiche WebLink
HCM 2010 TWSC <br />2: Jaguar Way/Project Dwy & School Dwy 09/15/2017 <br />Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project Sun Synchro 9 Report <br />LSA Analyst AY Page 1 <br />Intersection <br />Int Delay, s/veh 0 <br />Movement EBL EBR NBL NBT SBT SBR <br />Lane Configurations <br />Traffic Vol, veh/h 0 0 0 139 144 0 <br />Future Vol, veh/h 0 0 0 139 144 0 <br />Conflicting Peds, #/hr 0 0 0 0 0 0 <br />Sign Control Stop Stop Free Free Free Free <br />RT Channelized - None - None - None <br />Storage Length 0 - - - - - <br />Veh in Median Storage, # 0 - - 0 0 - <br />Grade, % 0 - - 0 0 - <br />Peak Hour Factor 96 96 96 96 96 96 <br />Heavy Vehicles, % 2 2 2 2 2 2 <br />Mvmt Flow 0 0 0 145 150 0 <br /> <br />Major/Minor Minor2 Major1 Major2 <br />Conflicting Flow All 295 150 150 0 - 0 <br /> Stage 1 150 - - - - - <br /> Stage 2 145 - - - - - <br />Critical Hdwy 6.42 6.22 4.12 - - - <br />Critical Hdwy Stg 1 5.42 - - - - - <br />Critical Hdwy Stg 2 5.42 - - - - - <br />Follow-up Hdwy 3.518 3.318 2.218 - - - <br />Pot Cap-1 Maneuver 696 896 1431 - - - <br /> Stage 1 878 - - - - - <br /> Stage 2 882 - - - - - <br />Platoon blocked, % - - - <br />Mov Cap-1 Maneuver 696 896 1431 - - - <br />Mov Cap-2 Maneuver 696 - - - - - <br /> Stage 1 878 - - - - - <br /> Stage 2 882 - - - - - <br /> <br />Approach EB NB SB <br />HCM Control Delay, s 0 0 0 <br />HCM LOS A <br /> <br />Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR <br />Capacity (veh/h)1431 - - - - <br />HCM Lane V/C Ratio - - - - - <br />HCM Control Delay (s) 0 - 0 - - <br />HCM Lane LOS A - A - - <br />HCM 95th %tile Q(veh) 0 - - - - <br />3-103