Laserfiche WebLink
PROJECT TITLE: <br />Alley Improvement Program <br />PROJECT CATEGORY: <br />Street Improvements <br /> Alley Rehabilitation <br />PROJECT NEED: <br />The Citywide network of Portland Cement Concrete <br />(PCC) and asphalt alleys is in extreme state of <br />deterioration with the presence of numerous potholes, <br />cracking, spalling, and uplifting. PCC pavement will <br />eliminate the drainage problems associated with the <br />asphalt pavement and provide a longer life for the <br />alleys. <br />PROJECT DESCRIPTION: <br />This project will provide for the removal of existing <br />damaged pavement and reconstruction with Portland <br />Cement Concrete (PCC) for alleys citywide. <br />PROJECT FUNDS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />M2 LOCAL <br />FAIRSHARE <br />$150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 <br />TOTAL $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 <br />PROJECT COSTS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />Construction $138,500 $138,500 $138,500 $138,500 $138,500 $138,500 $138,500 <br />Engineering $11,500 $11,500 $11,500 $11,500 $11,500 $11,500 $11,500 <br />TOTAL $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 $150,000 <br />LOCATION MAP <br />CITY WIDE <br />CONTACT:DATE: <br />18-Apr-2018 <br />AGENCY: <br />Public Works Agency <br />DIVISION: <br />Design Engineering Jason Gabriel, Principal Civil Engineer <br />- 1 - <br />CITY OF SANTA ANA FY 18/19 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-20