Laserfiche WebLink
PROJECT TITLE: <br />Main Street Slurry Seal and Resurfacing: 1st to <br />Civic Center <br />PROJECT CATEGORY: <br />Street Improvements <br /> Arterial Street Rehabilitation <br />PROJECT NEED: <br />The City's Pavement Management Program has been <br />developed to identify the preventative maintenance <br />requirements for the City's street network. The <br />application of a surface seal to streets with <br />improvements constructed in the last 10 years will <br />ensure a high level of service for years to come. <br />PROJECT DESCRIPTION: <br />Application of slurry seal, crack seal, and minor <br />pavement resurfacing with asphalt concrete. The work <br />also include replacement/installation of missing or <br />damaged curbs, gutters, sidewalk, driveway <br />approaches, wheelchair ramps, and striping. <br />PROJECT FUNDS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />RMRA SB1 $376,000 <br />TOTAL $376,000 <br />PROJECT COSTS FY 18/19 FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 <br />Construction $348,000 <br />Engineering $28,000 <br />TOTAL $376,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />18-Apr-2018 <br />AGENCY: <br />Public Works Agency <br />DIVISION: <br />Design Engineering Jason Gabriel, Principal Civil Engineer <br />- 3 - <br />CITY OF SANTA ANA FY 18/19 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-22