Laserfiche WebLink
DUDEK <br />27372 CALLE ARROYO <br />SAN JUAN CAPISTRANO, CALIFORNIA 92675 <br />T 949.450.2525 F 949.450.2626 <br />1 Statement of Qualifications <br />1.A Cover Letter <br />June 4, 2018 <br />Ms. Suzi Furjanic <br />City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />Subject: Proposal for Centennial Lake Renovation <br />Dear Ms. Furjanic: <br />Thank you for allowing us the opportunity to submit our proposal for the Centennial Lake Renovation <br />Project. The Dudek team is poised to serve the City's needs by excellence in delivering results for the <br />following reasons. <br />Project Approach with a Focus on Decreased Long Term Maintenance <br />Through a series of meetings and discussions with City staff, together, we have developed a detailed <br />lake rehabilitation plan for Centennial Lake. The rehabilitation plan is specifically focused on <br />addressing and mitigating each of the identified (7) major lake management categories deficiencies <br />of Centennial Lake and providing additional enhancements to create a lake ecosystem that is self- <br />correcting and results in decreased long term maintenance needs. Key Issues of the project include <br />Improving safety for lake maintenance personnel, improving lake circulation and aeration, improving <br />lake fishery and wildlife habitat, determining how much water the lake is using and remediating any <br />leaks or seepage, and lastly obtaining guidance on lake maintenance procedures. <br />Experienced Engineers and Environmental Professionals <br />Our team is led by Jonis Smith, PE, CFM with over 23 -years of experience In lake design, lake <br />inspection, lake construction, and lake management. Our team has recently designed and completed <br />pond/basin design at other Southern California facilities and community developments. In our <br />proposal to the City, the Dudek team can point to numerous, relevant projects, which have tackled, <br />resolved and have verifiable success stories associated with each. Further, our staff is comprised of <br />team members who are experts in CEQA compliance, resource agency permitting and fisheries, lake <br />design, water quality and treatment systems, site grading and site design, pump station design, and <br />soils and geology. <br />Conclusion <br />Bob Ohlund as Vice President of Dudek is authorized to bind the firm and designates Jonis Smith as <br />the engineering project manager for this project. If you have any question or wish to discuss our <br />proposal, please contact him at 949.212.0916 orjsmith@dudek.com with any questions about our <br />proposal. <br />Sineer 1 <br />7� <br />Bob hlund, PE <br />Vice President <br />I <br />DUDEK Proposal <br />Renovation.. <br />25E-14 <br />