My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER ENGINEERING CONSULTING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
09/18/2018
>
25E - AGMT WATER ENGINEERING CONSULTING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 5:01:52 PM
Creation date
9/13/2018 4:56:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
9/18/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
switch or by unplugging from a receptacle. The <br />sump pump will have an Integral float switch for <br />on/off function and can be removed from power by <br />unplugging from a receptacle. <br />STATEMENT OF QUALIFICAITONS <br />Fountain Jet Accent Lighting: Accent lighting will <br />be incorporated into the design of the proposed r 4 <br />fountain water feature to be located near peninsula. <br />The accent ilghting will be powered from a t. <br />protected submersible power cable fed from an <br />existing load centerthat will run along the bottom of the lake. The light can <br />be controlled with a lighting control panelwith elthera programmable timer <br />or a photocell so that the lights will come on at dusk and turn off at dawn. <br />We will work with the City to develop a control strategy for the lighting. <br />and lighting. <br />The Design Development phase will also Include 60% complete design for the Biological Water <br />Quality Control System including: <br />• Submerged biological filters, <br />• Vascular vegetation wetland planters, <br />• Aquaflc vegetation planters, <br />• Fishery management plan, <br />• Waterfowl management plan, and <br />• Wildlife management plan <br />The Design Development phase will also <br />include 60% complete design for the <br />Environmental Water Quality Control System <br />Including <br />• Waterfowl habitat island grading, <br />• . Waterfowl habitat island planting palette <br />• Waterfowl habitat island irrigation plan <br />• Lake fishery stocking plan <br />• Lake area vector control plan, <br />• Lake maintenance plan. <br />• Lake area trash management plan <br />Our design plans will include grading design and a plant palette <br />developed by our in-house watertowt specialist restoration <br />ecologist, and a landscape architect to create a habitat and an <br />environment that Is favorable to native waterfowl. <br />The socio -behavioral water quality system includes elements intended to modify behavior of park <br />users in a way that results in better water quality. The Design Development phase will Include 60% <br />complete design for Socio -Behavioral Water Quality System including: <br />• Informational/educational signage, <br />• Docent program planning, <br />• Maintenance activity planning <br />DUDEK Proposal for Centennial Lake Renovation <br />25E-26 <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.