City of Santa Ana <br />drain Improvements capable of matching existing <br />drainage characteristics will be necessary. <br />Discharging into Santiago Creek through a <br />proposed storm drain will only be considered if all <br />other drainage options are not feasible. <br />Once the design options have been vetted by <br />the Project Team, Tetra Tech will document all <br />applicable regulatory requirements, stakeholder <br />needs, project opportunities and constraints to be <br />used as a Basis of Design. The Basis of Design <br />will be the guide to refine the Concept Design to <br />30% level for review and approval. At this time we <br />will provide a Technical Memo documenting the <br />anticipated permits needed for the project. <br />We will perform Value Engineering, looking at <br />all project factors, including community impacts, <br />pedestrian and bicycle detours, aesthetics, <br />environmental clearances, right-of-way, permitting <br />issues, utilities, access and clearances, value, <br />security, safety, constructability, maintenance, <br />durability, life cycle costs, lead times, availability <br />and construction related issues. <br />The Tetra Tech Team understands fundamental <br />project issues and functions, leading to higher <br />quality.value engineering recommendations early <br />in the design stage that are more useful to the <br />owner. With Tetra Tech's design leadership and <br />engagement of the Project Team In the process, <br />the community will benefit from a beautiful, safe, <br />user friendly, environmentally friendly, and low <br />maintenance connectivity enhancement <br />.PEDESTRIAN PATH FINAL DESIGN <br />Upon City Approval of the Concept Plan, our highly <br />qualified Team will commence the final design <br />to achieve 90% submittal completion level. To <br />accomplish this, we will provide monthly progress <br />prints and reports to keep the City Project Manager <br />engaged and informed. In addition, we propose <br />two (2) over -the shoulder reviews to obtain input <br />and comments from the City. In this way, the 90% <br />submittal will be complete to the City's satisfaction, <br />with minimal comments expected. <br />12 DESIGN SERVICES RFP NO.: 18-042 <br />To facilitate the PS&E development, our qualified <br />Team includes Registered Engineers who <br />are familiar with civil infrastructure and active <br />transportation Capital Improvement Projects, <br />Including ATP Grant Requirements, Caltrans <br />Highway Design Manual Chapter 1000 for Bikeway <br />Facilities, and the NACTO Design Guidelines <br />for Bikeways. The development of PS&E for the <br />pedestrian facility will consider the connections and <br />access points, and these additional relevant design <br />standards: <br />T�J Manual on Uniform Traffic Control Devices <br />(MUTCD), part 9 and California Supplement <br />ra Americans with Disabilities Act <br />T7 AASHTO Guide for the Development of Bicycle <br />Facilities (1999) <br />N FHWA/FRT, 'Rails -with Trails: Lessons Learned', <br />(2004) <br />to Non -Motorized Technical Reference Guide, <br />Caltrans (2005) <br />D Caltrans Standard Plans <br />6:1 Caltrans Standard Specifications <br />=T Standard Special Provisions for Public Works <br />Construction (2012 Edition) <br />9 City of Santa Ana Standard Plans <br />.3 County Metrolink, Amtrak, CPUC Requirements, <br />If applicable <br />0 Relevant State Local Assistance Procedure <br />Manuals and requirements <br />All regulatory and permit requirements as <br />required and confirmed by the consultant <br />The 90% submittal will include final plans, <br />specifications, and estimates (PS&E). Prior <br />to submittal to the City, we will perform value <br />engineering in collaboration with the City Project <br />Manager. We will also perform 1) a thorough <br />Interdisciplinary Review, and 2) a Quality Control <br />check, checking against the Basis of Design and <br />the applicable codes and requirements. <br />DELIVERING A DESIGN WITHIN <br />BUDGET <br />Perhaps most importantly, the Tetra Tech team <br />is committed to delivering a project that not only <br />25F-27 <br />