ENVIRONMENTAL PLANNING • SANTA BARBARA, CA,
<br />Ms. Longman is an urban and environmental planner with extensive
<br />experience In the preparation and management of CEQA/NEPA
<br />technical documents, permitting, and coordination with government
<br />M:S;;1Jroan:and Regional.,
<br />and regulatory agencies, She has worked on a variety of projects
<br />Rlanriirg;;Cal'ifornia state::
<br />Including transportation, energy (Solar, Wind, Power Plants, and 011 &
<br />Polytechnic;Unive[sity;. ` :: ;
<br />Gas), mixed-use, educational (K-12 and higher education), industrial,
<br />Pomona, 2005:: ,
<br />and public works. As a planner, she works with public agencies In the
<br />g A , GeograpFiy, San
<br />Identification of existing land use conditions, analyzing a proposed
<br />Francisco: state. Univets.....
<br />project for compatibility with existing land uses, and assessing the
<br />2001
<br />consistency of a proposed project with relevant planning policies
<br />A A Geography, Santa
<br />and regulations. Ms, Longman also has experience In preparing
<br />Barba�a;City'Cgllege
<br />aesthetics studies for environmental documents, zoning compliance,
<br />design review, and public outreach efforts including public
<br />J2egistrat�ons
<br />workshops and community meetings.
<br />Ce._rtied__Planner; Americari.,"
<br />Instifuta of Certified Planners
<br />Relevant Experience
<br />�A1cP)
<br />Replacement of the Pedestrian Bridge Spanning Santiago::`.LEE
<br />b accredited professional '
<br />Creek Located Acgacent to the Arden[Modjeska House and
<br />for new bullding`and .
<br />Garden MND, Orange County, CA, Primary author of an Initial
<br />constroctiont(LEEDAP:BD#.C)'
<br />Study/Mitigated Negative Declaration (IS/MND) for the demolition
<br />Years;of Experience
<br />of the existing pedestrian bridge spanning Santiago Creek and the
<br />74
<br />Installation of a pre -constructed replacement bridge, The existing
<br />.
<br />pedestrian bridge spanning Santiago Creek was older and did not
<br />provide ADA (handicapped) accessibility. The new bridge provides
<br />improved access for the public to the historic ModJeska House and
<br />Gardens.
<br />California High -Speed Rail Project EIR/EIS, Los Angeles
<br />and Orange Counties, CA. Task manager for the preparation
<br />of technical reports and analysis of environmental impacts in the
<br />areas of land use and aesthetics for baseline conditions for the
<br />13 jurisdictions located along the alignment. Helped author the
<br />interagency coordination plan for the Anaheim to Los Angeles Union
<br />Station portion of the proposed California High -Speed Raft Project.
<br />University Business Park Specific Plan EIR, San Marcos, CA. :
<br />Primary author for the University Business Park SpeeHic Plan EIR,
<br />which encompassed an 86 -acre site. The specific plan proposed to
<br />develop a high-technology business park (light industrial, research
<br />and development, manufacturing, and office uses), multi -family
<br />residential units, park, open -space preservation, and infrastructure
<br />improvements (including roadways) within the City of San Marcos.
<br />Led the project team in Identifying and developing a comprehensive
<br />plan to analyze the compatibility of the proposed development with
<br />the existing land uses. She analyzed the potential impacts of the
<br />proposed project for land use, aesthetics, hazards and hazardous
<br />materials, population and housing, public services, recreation, traffic,
<br />and utilities. Was Involved in many public outreach efforts including
<br />public workshops for the proposed project.
<br />25F-74
<br />
|