My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MATCH POINT TENNIS ACADEMY, LLC.
Clerk
>
Contracts / Agreements
>
M
>
MATCH POINT TENNIS ACADEMY, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2018 9:08:49 AM
Creation date
9/18/2018 12:14:15 PM
Metadata
Fields
Template:
Contracts
Company Name
MATCH POINT TENNIS ACADEMY, LLC.
Contract #
A-2018-205
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
9/4/2018
Expiration Date
9/4/2019
Insurance Exp Date
6/23/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S YEAR BUDGET MAINTENANCE PLAN <br />The following includes a list of goals and time tables based on the Court Analysis <br />Survey, These timetables can be used in budgeting for short and long term <br />projects. <br />=13 <br />crtpCion <br />Schedule <br />Laser Grading <br />Laser grading should be considered every <br />Every 10-15 <br />V lift <br />10-15 years. <br />years <br />-f-oj*)'--D'r-e'-ss---' — <br />—To p -d 're s -s I 'ng7 F-, necessary '"'-" for each annual <br />Annually <br />opening, 1.2 torts of Har -Tru per court <br />should be applied with each top-clress» <br />Line'rape <br />Line Tapes should be pulled up prior to top <br />Annually <br />replacement <br />dressing, This will ensure that lines are <br />straight, tight and have no surface material <br />buildup on either side of line tapes during <br />jhq,-pjpyjqA.season, <br />3rodscrer ns <br />Windscreens should be replaced every 3.5 <br />Now <br />years or as they start to fade, discolor and <br />& <br />et b rl ttle, <br />ears <br />Fa tr�6_ i' d <br />Fencing should be painted or replaced cis <br />As Needed <br />Courts <br />needed, Keeping this project in a cycle will <br />help to eliminate a build up of high <br />'Y66is <br />bud star costs, . . ... ..... . ___ .. .... <br />& <br />.. <br />Keeping Brushes and Hand tools In good <br />Drag <br />FquIpment <br />working condition is essential for great Har- <br />Brushes, <br />Tru courts, Replacing worn brushes, lutp <br />Line Masters <br />blades etc, will keep the tools working <br />Lutes <br />properly. <br />Aussie's <br />a reliableroller on site will be <br />Grease <br />Important to ensure the best possible <br />annually <br />courts. Preventative maintenance will <br />perform <br />ensure reliable equipment, <br />scheduled <br />Preventative <br />-Net-s-,-Net —Coolers, <br />Maintenance <br />An�iin—ltles- <br />— <br />posts , Beaches, e tc. <br />As Needed <br />should be replaced as needed. <br />=13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.