My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DAVID EVANS AND ASSOCIATES
Clerk
>
Contracts / Agreements
>
D
>
DAVID EVANS AND ASSOCIATES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2022 8:51:54 AM
Creation date
9/18/2018 12:14:20 PM
Metadata
Fields
Template:
Contracts
Company Name
DAVID EVANS AND ASSOCIATES
Contract #
A-2018-202
Agency
Public Works
Council Approval Date
8/21/2018
Expiration Date
8/20/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal to provide <br />Landscape Architectural Design for Gth & Lacy Park • RFP No. 18.038 <br />parkways and median on Gene Autry Trail north of <br />Vista Chino as well as the development of a 1.7-acre <br />passive park. <br />The development of the park achieved numerous <br />aspects that truly make this a successful project. We <br />have improved the quality of life for nearby residents <br />and demonstrated stewardship of the natural <br />environment, while creating an iconic landmark for <br />visitors to Palm Springs and the Coachella Valley. <br />The revitalization of this once vacant parcel of <br />land into a unique oasis proved successful in both <br />function and form. It improved drainage, increased <br />property values, increased safety while decreasing <br />negative uses such as vandalism, illegal dumping <br />and loitering..... and it provided a place to enjoy the <br />outdoor environment! <br />Year Completed. 2011; Client Mane: City of Palm <br />Springs; Contact Name and Number., Marcus Fuller <br />- 760, 323. 8253 <br />Ovrom Park, Burbank, California <br />DEA provided project <br />management, master <br />planning, final <br />design, landscape <br />architecture, civil <br />engineering, <br />and construction <br />management <br />for this two -acre <br />community park. The park design appeals to all <br />ages and makes exceptional use of the small <br />space by featuring playgrounds, a regulation -size <br />basketball court, walking paths, covered picnic <br />areas, open -play turf areas, and quiet spaces. The <br />park also includes a 7,025 square foot community <br />center that houses programmed recreational <br />activities. Protecting environmental resources and <br />implementing sustainable practices were of utmost <br />importance. The planting design consists of drought <br />tolerant plants that provide shade, screen and color. <br />The irrigation system uses recycled water and is <br />controlled by a centralized system that monitors <br />soil moisture levels, weather patterns, and system <br />pressure loss for efficient water use. <br />Year Completed: 2010; Client Name: City of <br />Burbank; Contact Name and Number: Maribel <br />Leyland - 818.238.5180 <br />References <br />Memory Lane Park <br />City of Santa Ana <br />Contact: Suzi Furjanic <br />714.571.4241 <br />San Bernardino Valley <br />Bryce Hanes Park Municipal Water District <br />Contact: Wen Huang <br />909,435.8418 <br />14 1 May 21, 2018 1 David Evans and Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.