Laserfiche WebLink
Electrical Lighting Design Services for Various Park Locations <br />RFP No. 18-031 <br />d. Understanding of Need <br />The City of Santa Ana desires to continue its efforts in installing security lighting systems by <br />using the same hardware and fixtures as those recently installed at: Fisher Park, Santiago Park, <br />Heritage Park, Santa Anita Park, Windsor Park, Madison Park, Lillie King Park, Bomo Koral <br />Park. <br />Parks that require lighting upgrades are as follows: <br />Pacific Electric Bike Trail — Phase 1 currently does not have electrical or lighting systems. <br />Irrigation controllers with electrical connection points are on site. Lighting shall be <br />designed for the entire length of the trail from McFadden Avenue to Occidental Street. <br />Saddleback View Park currently does not have electrical or lighting systems. An irrigation <br />controller with electrical connection point is on site. Lighting shall be designed for the <br />meandering walkway in the park. <br />Morrison Park currently has lighting for the basketball and tennis courts only. Additional <br />lighting, including additional power supply equipment and facilities, shall be designed for <br />the interior meandering walkway and the parking lot. The electrical system shall be <br />centralized and serve all lights in the park. <br />AAIQS GR®UP Page 9 <br />