My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IDS GROUP, INC. (2)
Clerk
>
Contracts / Agreements
>
I
>
IDS GROUP, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2021 3:55:47 PM
Creation date
9/18/2018 2:17:16 PM
Metadata
Fields
Template:
Contracts
Company Name
IDS GROUP, INC.
Contract #
A-2018-185
Agency
Public Works
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
11/12/2021
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Lighting Design Services for Various Park Locations <br />RFP No. 18-031 <br />City of Irvine San Diego Creek Bike Trail Lighting Improvements: San Diego Creek to <br />Culver, CIP 341302, Spectrum to 1-405 CIP 34150, 1.405 to Culver CIP 322920, and Peters <br />Canyon CIP 341303 <br />Irvine, CA <br />The City of Irvine has contracted with IDS on multiple <br />occasions to provide engineering design services for <br />various pedestrian trail projects that meander throughout <br />the city. IDS was the preferred consultant for these projects <br />since they required close coordination between disciplines <br />that only a multi -disciplined firm can provide. <br />IDS designed and prepared electrical plans for the trail <br />lighting as envisioned by the City. The plan shows the <br />proposed fixtures, photometric lighting study, fixture counts <br />and cut sheets, meter, pedestal, and distribution circuitry. In <br />preparing these plans, IDS conducted calculations of <br />electrical loads, load shedding, short circuit calculations, <br />voltage drop and the structural design of light fixture <br />foundation. In addition, IDS prepared a demolition plan <br />showing the removals of the items that are in conflict with <br />the proposed lighting, hardscape, and irrigation <br />improvements such as hardscape, landscape, trees, <br />conduit, and piping. <br />IDS coordinated with the utility companies which maintain <br />facilities in the affected area and develop a utility relocation <br />plan for the utilities impacted by this project. The plans and <br />specifications under this task identified the time frames to <br />complete the utility work. <br />AAf D.S GROUP Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.