My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-2954
Clerk
>
Ordinances
>
2011 - 2020 (NS-2813 - NS-3000)
>
2018 (NS-2935 - NS-2962)
>
NS-2954
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 1:44:05 PM
Creation date
9/20/2018 5:00:24 PM
Metadata
Fields
Template:
City Clerk
Document Relationships
NS-2816
(Amends)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2011 (NS-2813 - NS-2825)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. A project description letter containing: <br />A. <br />A list of all facilities proposed to be installed (including <br />antennas, associated equipment, poles, power and fiber to <br />the facility), along with the corresponding volume of each. <br />B. <br />The height of each, as measured from the ground. <br />C. <br />A description of the concealment elements associated with <br />the wireless communication facility, including but not limited <br />to painting and shielding. <br />D. <br />The materials that comprise the facilities. <br />E. <br />A description of any ground disturbance necessary to <br />complete the proposed project. <br />F. <br />A description of the noise levels the facilities will emit. <br />G. <br />A description of any lighting to be installed along with the <br />facilities. <br />H. A description of any signage to be installed along with the <br />facilities. <br />I. A description of the security plan for the site, including an <br />emergency contact, and a description of the emergency <br />breaker switch. <br />J. A description of three alternative sites that would also <br />accommodate the proposed Facilities, and a brief <br />explanation as to why the proposed site was selected (i.e., <br />proximity to power source). <br />8. A coverage map indicating the area which will be served by the <br />proposed wireless facility. <br />9. A construction plan and schedule, to include start and end dates <br />and phasing, as required by the Agency. <br />10. Engineering certification demonstrating compliance with all existing <br />RF emission standards. <br />11. A non-refundable application and processing fee, in an amount <br />established by resolution of the City Council to defray the City's <br />costs to process the application and to inspect the facility. <br />12. Electronic plans (in .pdf file format and electronic GIS file format <br />compatible with the City's geographic information system database) <br />that include the following: <br />A. A title sheet. <br />B. A site plan, showing: <br />i. The exact location and route requested for applicant's <br />proposed facilities, including other improvements in <br />the area. <br />ii. If excavation is required, the plans must include the <br />the location and depth of all overhead and <br />underground public utility, cable, water, sewer <br />drainage, fiber optic, and other facilities in the public <br />right-of-way along the proposed route. <br />iii. The location(s), if any, for interconnection with the <br />facilities of any other parties. <br />Ordinance No. NS -2954 <br />Page 7 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.