My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2018
>
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 9:29:20 AM
Creation date
9/20/2018 5:10:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2018-075
Date
9/18/2018
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana 2. CEQA Findings <br />Impact Statement Impact Summary Findings <br />significant adverse impacts. <br />Therefore, impacts would be less <br />than significant. <br />Table 2-2. CECA Findings for the Elan Mixed -Use Development (Project -Level Component) <br />Impact Statement Impact Summary Findings <br />Air Quality _ <br />Impact 4.1-E1: Construction of the Elan Project <br />could violate an air quality standard or <br />contribute to an existing or projected air quality <br />violation. <br />Construction activities would temporarily <br />create emissions of dust, fumes, equipment <br />exhaust, and other air contaminants. With the <br />exception of VOC emissions, the maximum level <br />of daily construction emissions generated by <br />the proposed project would not exceed <br />SCAQMD's daily significance thresholds for any <br />criteria pollutants during any of the <br />construction phases. <br />Finding 1. Changes or alterations have been <br />required in, or incorporated into the project <br />which avoid, substantially lessen, or reduce the <br />magnitude of the significant environmental <br />effect. <br />Implementation of mitigation measures MM -OZ <br />4.2-14 through MM -OZ 4.2-16 from the MEMU <br />EIR and newly developed mitigation measure <br />MM -AQ -3 would reduce potential impacts to <br />less than significant. <br />Impact 4.1-E3: The proposed Elan Project <br />Construction -related daily emissions associated <br />Finding 1. Changes or alterations have been <br />would not result in a cumulatively considerable <br />with project development would exceed <br />required in, or incorporated into the project <br />increase of criteria pollutant for which the <br />SCAQMD thresholds for VOCs during overlap of <br />which avoid, substantially lessen, or reduce the <br />project region is non -attainment. <br />the building construction and architectural <br />magnitude of the significant environmental <br />coating phases, with the vast majority of the <br />effect. <br />emissions resulting from the application of <br />paints and primers on the new buildings. <br />Implementation of mitigation measure MM -AQ - <br />Consequently, emissions generated by <br />3 would reduce potential impacts to less than <br />construction of the Elan Project would be <br />significant. <br />cumulatively considerable and would constitute <br />a substantial contribution to an existing or <br />projected air quality violation without <br />mitigation. <br />Cultural Resources <br />Metro East Mixed -Use Overlay District Expansion and Elan August 2018 <br />Development Projects 2-13 ICF 19.18 <br />Findings of Fact/Statement of Overriding Considerations <br />
The URL can be used to link to this page
Your browser does not support the video tag.