My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2018
>
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 9:29:20 AM
Creation date
9/20/2018 5:10:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2018-075
Date
9/18/2018
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation Monitoring and Reporting Program <br />Implementation <br />Due to the program- and project -level components of this SEIR, the MMRP has been divided into two <br />parts to address each component separately. The mitigation measures that pertain to <br />implementation of the MEMU Overlay District Expansion and their methods of implementation are <br />listed in Table 1. The mitigation measures, which include several mitigation measures from the <br />program -level component, that pertain to the Elan Development Project are listed in Table 2. Certain <br />inspections and reports may require preparation by qualified individuals, and these are specified as <br />needed. The timing and method of verification for each measure are also specified. <br />It should also be noted that where applicable, mitigation measures from the 2007 Final MEMU EIR <br />were carried forward into this SEIR, and, for some impacts, new mitigation measures were <br />developed (highlightedgray in the tables below). Mitigation measures carried forward from the <br />2007 Final MEMU EIR maintained their original numbering and naming convention from the MEMU <br />EIR and begin with "MM -OZ" in this MMRP. <br />Project Contact Information <br />Lead Agency: <br />City of Santa Ana, Planning and Building Agency <br />20 Civic Center Plaza, M20 <br />Santa Ana, CA 92702 <br />Contact, Person/Telephone: <br />Ali Pezeshkpour, AICP, Senior Planner <br />(714) 647-5882 <br />Metro East Mixed -Use Overlay District Expansion and Elan August 2018 <br />Development Projects 2 ICF 00019.18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.