Laserfiche WebLink
City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation Monitoring and Reporting Program <br />Implementation <br />Due to the program- and project -level components of this SEIR, the MMRP has been divided into two <br />parts to address each component separately. The mitigation measures that pertain to <br />implementation of the MEMU Overlay District Expansion and their methods of implementation are <br />listed in Table 1. The mitigation measures, which include several mitigation measures from the <br />program -level component, that pertain to the Elan Development Project are listed in Table 2. Certain <br />inspections and reports may require preparation by qualified individuals, and these are specified as <br />needed. The timing and method of verification for each measure are also specified. <br />It should also be noted that where applicable, mitigation measures from the 2007 Final MEMU EIR <br />were carried forward into this SEIR, and, for some impacts, new mitigation measures were <br />developed (highlightedgray in the tables below). Mitigation measures carried forward from the <br />2007 Final MEMU EIR maintained their original numbering and naming convention from the MEMU <br />EIR and begin with "MM -OZ" in this MMRP. <br />Project Contact Information <br />Lead Agency: <br />City of Santa Ana, Planning and Building Agency <br />20 Civic Center Plaza, M20 <br />Santa Ana, CA 92702 <br />Contact, Person/Telephone: <br />Ali Pezeshkpour, AICP, Senior Planner <br />(714) 647-5882 <br />Metro East Mixed -Use Overlay District Expansion and Elan August 2018 <br />Development Projects 2 ICF 00019.18 <br />