Laserfiche WebLink
City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation Implementing <br />Measure No. Mitigation Measure Monitoring Party Party Mitigation Timing <br />MM -OZ 4.2-15 The developer shall require by contract specifications that Planning and Project Prior to <br />materials that do not require painting be used during construction Building Agency applicant construction <br />to the extent feasible. Contract specifications shall be included in <br />the proposed project construction documents, which shall be <br />reviewed and approved by the City of Santa Ana Planning and <br />Building Agency staff. <br />MM -OZ 4.2-16 The developer shall require by contract specifications that pre- <br />painted construction materials be used to the extent feasible. <br />Contract specifications shall be included in the proposed project <br />construction documents, which shall be reviewed and approved by <br />the City of Santa Ana Planning and Building Agency staff. <br />Planning and Project Prior to <br />Building Agency applicant construction <br />MM AQ -1 All applicants proposing development of projects within the MEMU <br />Planning and Project Prior to <br />Overlay Zone and expansion area shall require their contractors, as <br />Building Agency applicant construction <br />a condition of contract, to further reduce construction -related <br />exhaust emissions by ensuring that all off-road equipment greater <br />than 50 horsepower (hp) and operating for more than 20 total <br />hours over the entire duration of construction activities shall <br />operate on an EPA -approved Tier 4 or newer engine. Exemptions <br />can be made for specialized equipment where Tier 4 engines are <br />not commercially available within 200 miles of the MEMEU <br />Overlay Zone and expansion area. The construction contract must <br />identify these pieces of equipment, document their unavailability, <br />and ensure that they operate on no less than an EPA -approved Tier <br />3 engine. <br />MM -AQ -2 All applicants proposing development of projects within the MEMU Planning and Project Prior to <br />Overlay Zone and expansion area shall require their contractors, as Building Agency applicant construction <br />a condition of contract, to use diesel trucks that have 2010 model <br />year or newer engines. In the event that 2010 model year or newer <br />diesel trucks cannot be obtained, the contractor must provide <br />documentation to the City showing that a good faith effort to locate <br />such engines was conducted. If the lead agency determines that <br />2010 model year diesel trucks are not feasible, supported by <br />substantial evidence in the record, then the lead agency shall <br />require the use of trucks that meet EPA 2007 model year NOx <br />emissions requirements, at a minimum. <br />Metro East Mixed -Use Overlay District Expansion and Elan Development Projects 7 August 2018 <br />ICF 00019.18 <br />