Laserfiche WebLink
City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation <br />Implementing <br />Measure No. Mitigation Measure Monitoring Party <br />Party Mitigation Timing <br />MM -OZ 4.9-4 The project applicant shall require by contract specifications that Planning and <br />Project Prior to issuance of <br />- heavily loaded trucks used during construction would be routed Building Agency <br />applicant grading permit <br />away from residential streets to the extent feasible. Contract <br />specifications shall be included in the proposed project <br />construction documents, which shall be reviewed by the City prior <br />to issuance of a grading permit. <br />MM -OZ 4.9-6 Prior to, issuance of building permits, building, plans shall specify <br />Planning and <br />Project <br />Prior to issuance of <br />the STC rating of windows and doors for all residential land uses. <br />Building Agency <br />applicant <br />building permits <br />Window and door ratings shall be sufficient to reduce the interior <br />4ualified acoustical consultant as part of the final engineering - <br />noise level to a CNEL of 45 dBA or less, and shall be determined by <br />prior to issuance of building permits. It is noted that exterior living <br />a qualified acoustical consultant as part of the final engineering <br />combination of private space (patios, balconies, etc.) and common <br />design of the project. <br />! <br />- necessary to provide'noise control at all private areas, provided ' <br />MM -OZ 4.9-7 The developer shall provide proper shielding for all new HVAC <br />Planning and <br />Project <br />During project <br />systems used by the proposed residential and mixed use buildings <br />Building Agency <br />applicant <br />design and <br />to achieve an attenuation of 15 dBA at 50 feet from the equipment. <br />various transit -related measures to improve and expand bus <br />the project <br />construction <br />MM NOI-1 Where future residential uses would be constructed in areas Planning and <br />-Project' Prior to issuance of <br />exposed to noise, exterior noise control shall be provided as Building Agency. <br />applicant ., . ' building permits j <br />necessary to comply with the City's exterior noise guideline of 65 <br />dB CNEL, as specified in the Noise Element of the General Plan. The : <br />noise control requirements, if any, shall be determined by a <br />4ualified acoustical consultant as part of the final engineering - <br />design of the project and shall be included on.the`building plans <br />prior to issuance of building permits. It is noted that exterior living <br />space for multi -family developments may be provided as a <br />combination of private space (patios, balconies, etc.) and common <br />areas (playgrounds, pool areas, etc:). As a result, it may not be <br />! <br />- necessary to provide'noise control at all private areas, provided ' <br />sufficient common area is included within the project. <br />i <br />TRANSPORTATION/TRAFFIC <br />MM -OZ 4.12-1 As part of the project, the City of Santa Ana and the project Public Works <br />Public Works During <br />sponsors shall work with the transit providers to implement <br />implementation of <br />various transit -related measures to improve and expand bus <br />the project <br />system service within the Overlay Zone. These measures may <br />include, but are not limited to, the following: <br />Metro East Mixed -Use Overlay District Expansion and Elan Development Projects 18 August 2018 <br />ICF 00019.18 <br />