My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2018
>
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 9:29:20 AM
Creation date
9/20/2018 5:10:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2018-075
Date
9/18/2018
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation Implementing <br />Measure No. Mitigation Measure Monitoring Party Party Mitigation Timing <br />Overlay Zone must use City -approved trip generation rates <br />specific to these projects. These studies are subject to City <br />review. <br />MM -TRA -1 The following improvements shall be installed prior to 2040, as the <br />Planning and <br />projected facilities are forecasted to be affected. Timing and <br />Building <br />funding of these improvements shall be based on a program as <br />Agency/Public <br />outlined in mitigation measure MM -OZ 4.12-4 (and included in the <br />Works <br />original MEMU EIR). <br />• Standard Avenue & First Street - widen northbound <br />approach and reconfigure to provide one left -turn lane, two <br />through lanes, and one right -turn lane, and widen the <br />southbound approach and reconfigure to provide one left -turn <br />lane and one shared through and right -turn lane, along with <br />two receiving lanes that merge back to one lane. <br />• Grand Avenue & Santa Ana Boulevard - convert westbound <br />shared through and right -turn lane to a right -turn only lane <br />and include an overlap right -turn phasing by prohibiting the <br />southbound U-turn movement. <br />• Grand Avenue & Fourth Street - widen northbound <br />approach to include an additional through lane and provide an <br />additional receiving lane on the north leg of the intersection. <br />Convert eastbound shared through and right -turn lane to a <br />through lane and construct a right -turn lane. <br />• Grand Avenue & First Street - widen northbound approach <br />to provide two left -turn lanes, three through lanes, and one <br />right -turn lane. Widen westbound approach to provide two <br />left -turn lanes, three through lanes, and one right -turn lane by <br />extending the current right -turn pocket and providing a <br />westbound right -turn overlap signal phasing. <br />• Lyon Street & First Street - widen northbound approach to <br />provide one left -turn lane, one shared through and left -turn <br />lane, and one right -turn lane with a right -turn signal overlap <br />phasing and split signal phasing for the north -south <br />approaches. Widen eastbound approach to convert the shared <br />through and right -turn lane into a third through lane and <br />construct a new right -turn lane. <br />Planning and Prior to 2040 <br />Building <br />Agency/Public <br />Works <br />Metro East Mixed -Use Overlay District Expansion and Elan Development Projects 22 August 2018 <br />ICF 00019.18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.