Laserfiche WebLink
City of Santa Ana <br />Table 2. Mitigation Monitoring and Reporting Program for the Elan Development Project <br />Mitigation Monitoring and Reporting Program <br />Mitigation <br />Implementing Mitigation <br />Measure No. Mitigation Measure Monitoring Party <br />Party Timing <br />QUALITY <br />MM -OZ 4.2- The developer shall require by contract specifications that the architectural Planning and <br />Project Prior to <br />14 coating (paint and primer) products used would have a VOC rating of 100 grams Building Agency <br />applicant construction <br />per liter or less. Contract specifications shall be included in the proposed project <br />construction documents, which shall be reviewed and approved by the City of <br />Santa Ana Planning and Building Agency staff. <br />MM -OZ 4.2- The developer shall require by contract specifications that materials that do not <br />15 require painting be used during construction to the extent feasible. Contract <br />specifications shall be included in the proposed project construction documents, <br />which shall be reviewed and approved by the City of Santa Ana Planning and <br />Building Agency staff. <br />Planning and Project Prior to <br />Building Agency applicant construction <br />MM -OZ 4.2- The developer shall require by contract specifications that pre -painted Planning and. Project Prior to <br />16 construction materials be used to the extent feasible. Contract specifications Building Agency applicant construction <br />shall be included in the proposed project construction documents, which shall <br />be reviewed and approved by the City of Santa Ana Planning and Building <br />Agency staff. <br />MM -AQ -3 All applicants proposing development of projects within the MEMU Overlay <br />Zone and expansion area shall require their contractors, as a condition of <br />contract, to reduce construction -related fugitive VOC emissions by ensuring that <br />low-VOC coatings that have a VOC content of 10 grams/liter (g/L) or less are <br />used during construction. The project applicant will submit evidence of the use <br />of low-VOC coatings to SCAQMD prior to the start of construction. <br />Planning and <br />Building Agency <br />Project <br />applicant <br />Prior to <br />construction <br />MM -OZ 4.4-2 Due to the lack of cultural resource studies for the Overlay Zone Expansion Planning and Project During <br />Area, and in order to avoid damaging any unidentified cultural resources, a Building Agency applicant construction <br />qualified archaeologist would be retained to monitor any significant ground - <br />disturbing activities in undeveloped areas within the Expansion Area, and any <br />deep (10" or deeper) ground -disturbing activities in all areas of the Expansion <br />Area. <br />Metro East Mixed -Use Overlay District Expansion and Elan Development Projects 26 August 2018 <br />ICF 00019.18 <br />