My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2018
>
2018-075 - Final Subsequent Environmental IMpact Report No. 2018-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 9:29:20 AM
Creation date
9/20/2018 5:10:19 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2018-075
Date
9/18/2018
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation Implementing Mitigation <br />Measure No. Mitigation Measure Monitoring Party Party Timing <br />_. <br />improvements. acco'rdingly. This improvement is subject to the review and <br />approval of the'City of Tustin and/or Caltrans.. <br />y. .. _ SR -55 northbound ramps at Fourth Street/Irvine Boulevard: Widen <br />and/or restripe the westbound approach on Fourth'Street to provide an <br />exclusive (free) right -turn lane.. Modify existing traffic signal as well as <br />existing signing and striping improvements accordingly. This improvement <br />is subject to the review and approval of the City of Tustin and/or Caltrans. , <br />Lyon Street at First Street: Widen Lyon Street to provide an exclusive <br />northbound left -turn lane. Widen and/or restripe First Street to provide an <br />exclusive eastbound right -turn lane. Modify the existing traffic signal for <br />split signal phasing for the northbound and southbound approaches and <br />• provide northbound right -turn overlap phasing: Remove west leg <br />crosswalk. Modify the existing signing and striping improvements <br />accordingly. <br />Mabury Street/Elk Lane at First Street: Widen and/or restripe Elk Lane <br />to provide a second exclusive northbound right -turn lane. Widen and/or <br />restripe First Street to provide an exclusive eastbound right -turn lane. <br />' Modify the existing traffic signal. for northbound right -turn overlap phasing <br />1" and existing signing and striping improvements accordingly. <br />Cabrillo Park Drive at First Street: Restripe First Street to convert the <br />second eastbound through lane to a second eastbound left -turn lane. Modify. . <br />the existing traffic signal for signing,and striping improvements _ <br />accordingly. <br />e ' . Elk Lane at Chestnut Avenue/Main Street: Install a traffic signal and <br />design for three-phase operations. Widen and/or restripe Main Street to <br />provide an exclusive westbound right -turn lane. Modify existing signing and <br />? strinina imnrnvements_ <br />MM -OZ 4.4-2 Due to the lack of cultural resource studies for the Overlay Zone Expansion Planning and Project During <br />Area, and in order to avoid damaging any unidentified cultural resources, a Building Agency applicant construction <br />qualified archaeologist would be retained to monitor any significant ground - <br />disturbing activities in undeveloped areas within the Expansion Area, and any <br />deep (10" or deeper) ground -disturbing activities, in all areas of the Expansion <br />Area. <br />Metro East Mixed -Use Overlay District Expansion and Elan Development Projects 35 August 2018 <br />ICF 00019.18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.