Laserfiche WebLink
City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation Implementing Mitigation <br />Measure No. Mitigation Measure Monitoring Party Party Timing <br />_. <br />improvements. acco'rdingly. This improvement is subject to the review and <br />approval of the'City of Tustin and/or Caltrans.. <br />y. .. _ SR -55 northbound ramps at Fourth Street/Irvine Boulevard: Widen <br />and/or restripe the westbound approach on Fourth'Street to provide an <br />exclusive (free) right -turn lane.. Modify existing traffic signal as well as <br />existing signing and striping improvements accordingly. This improvement <br />is subject to the review and approval of the City of Tustin and/or Caltrans. , <br />Lyon Street at First Street: Widen Lyon Street to provide an exclusive <br />northbound left -turn lane. Widen and/or restripe First Street to provide an <br />exclusive eastbound right -turn lane. Modify the existing traffic signal for <br />split signal phasing for the northbound and southbound approaches and <br />• provide northbound right -turn overlap phasing: Remove west leg <br />crosswalk. Modify the existing signing and striping improvements <br />accordingly. <br />Mabury Street/Elk Lane at First Street: Widen and/or restripe Elk Lane <br />to provide a second exclusive northbound right -turn lane. Widen and/or <br />restripe First Street to provide an exclusive eastbound right -turn lane. <br />' Modify the existing traffic signal. for northbound right -turn overlap phasing <br />1" and existing signing and striping improvements accordingly. <br />Cabrillo Park Drive at First Street: Restripe First Street to convert the <br />second eastbound through lane to a second eastbound left -turn lane. Modify. . <br />the existing traffic signal for signing,and striping improvements _ <br />accordingly. <br />e ' . Elk Lane at Chestnut Avenue/Main Street: Install a traffic signal and <br />design for three-phase operations. Widen and/or restripe Main Street to <br />provide an exclusive westbound right -turn lane. Modify existing signing and <br />? strinina imnrnvements_ <br />MM -OZ 4.4-2 Due to the lack of cultural resource studies for the Overlay Zone Expansion Planning and Project During <br />Area, and in order to avoid damaging any unidentified cultural resources, a Building Agency applicant construction <br />qualified archaeologist would be retained to monitor any significant ground - <br />disturbing activities in undeveloped areas within the Expansion Area, and any <br />deep (10" or deeper) ground -disturbing activities, in all areas of the Expansion <br />Area. <br />Metro East Mixed -Use Overlay District Expansion and Elan Development Projects 35 August 2018 <br />ICF 00019.18 <br />