My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KMEA
Clerk
>
Contracts / Agreements
>
K
>
KMEA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:45:07 PM
Creation date
10/8/2018 1:58:05 PM
Metadata
Fields
Template:
Contracts
Company Name
KMEA
Contract #
A-2018-190
Agency
PUBLIC WORKS
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
5/19/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[,N,,IKMEA <br />✓ Hydrology and Hydrogeological Assessments <br />✓ Forensic Studies and Evaluations <br />✓ CERCLA/RCRA Investigations <br />✓ LNAPL/DNAPL Evaluations <br />✓ Engineering Evaluation/Cost Analysis (EE/CA) and Action Memorandum (AM) <br />✓ Construction Management and Oversight <br />✓ CEQA/NEPA Support Studies and Evaluations <br />✓ Preparation of Mitigated Negative Declaration for Sand Compatibility and Opportunistic Use Program (SCOUP) — San Dieguito <br />Union High School District and City of Solana Beach 2015 <br />Proiect Related Exnerience <br />Southern California Edison (SCE) San Onofre Nuclear Generating Station — San Clemente, CA <br />Project Manager in responsible charge of scoping, costing and execution of environmental site characterization studies in support of the <br />San Onofre Nuclear Generating Station decommissioning. Work scope was broken into two phases: Historical Site Assessment (HSA) <br />and follow-on Site Characterization of the nature and extent of non -radiological chemical constituents of potential concern (COPCs) <br />associated with historical site operations and incidental chemical spills. Evaluations were conducted through laboratory analysis of <br />representative samples collected from surface, near -surface and subsurface soil and groundwater. The scope also included <br />characterization of systems, components and structures for lead -based paint, PCBs, mercury and for asbestos. The ultimate objective of <br />the site characterization was to provide an estimate of the class of waste and volume of impacted materials ultimately targeted for <br />demolition and removal during facility decommissioning. The non -radiological team's efforts were synchronized and were carried out <br />seamlessly with the radiological team with common project objectives and goals. The project deliverables included the HSA and Site <br />Characterization report including Objective Evidence Binders with all supporting documentation for SCE/NRC approval. <br />U.S. General Services Administration — Environmental Due Diligence Site Characterization and Phase II Environmental Site <br />Assessments in Support of the San Ysidro Land Port of Entry Expansion Project, San Ysidro, CA <br />Project Manager in responsible charge of preparing scope and costs for and execution of due -diligence environmental site assessment <br />and characterization studies at a former cab maintenance facility in preparation for property acquisition and transfer to GSA. Prepared <br />work plan documents and provided oversight for all field work involving soil and groundwater sampling and analytical laboratory testing. <br />Provided principal technical review of final site assessment reports prepared based on field investigation results and provided <br />recommendations to the GSA for feasibility of site for purchase along with remedial alternatives and associated costs. Also provided <br />principal review and consultation in support of other environmental site characterization work performed during various phases of the <br />construction resulting in cost savings of upwards of $1.2M realized by the GSA. <br />San Diego Gas and Electric — San Onofre Nuclear Generating Station Substation, San Clemente, CA <br />Project Task Leader for scoping, costing and scheduling the initial non -radiological site characterization and environmental site <br />assessments associated with the placement of the synchronous condenser at SONGS. The site characterization entailed providing <br />technical advisory and consultation regarding the types, numbers and locations of soil samples to be collected and chemically analyzed <br />from within the footprint of the future synchronous condenser to support compliance with SONGS license termination per the requirements <br />of the Nuclear Regulatory Commission, <br />San Diego County Regional Airport Authority — Supplemental Environmental Site Characterizations, San Diego Airport <br />Expansion and Improvements Project, San Diego, CA <br />Senior principal reviewer responsible for technical work scope development, execution and reporting of supplemental environmental site <br />characterization of landside properties including soil and soil vapor sampling and human health risk screening evaluations. <br />County of San Diego Department of General Services, East Mesa Regional Firing Range, San Diego, CA <br />Project Managerfor Task Order awarded under an as -needed contract with the County of San Diego Department of Public Works to <br />conduct an environmental site assessment at the East Mesa Regional Firing Range. Scope of work included the use of a limited <br />access drill rig to collect subsurface soil samples for laboratory analysis and assess the nature and extent of diesel -impacted soils <br />previously encountered at this facility. An on -site mobile analytical laboratory was used to accelerate data acquisition and to facilitate <br />Service Disabled Veteran Owned Small Business <br />
The URL can be used to link to this page
Your browser does not support the video tag.