INKMEA
<br />IRWIN
<br />reports for a wide variety of CEQA and NEPA projects, including Integrated Natural Resources Management Plans, Environmental
<br />Assessments, General Plans, Housing Elements, and a regional Resource Management Plan. Responsible for project management,
<br />schedules and budgets, and managing and meeting competing deadlines.
<br />Proiect Related Experience
<br />Five -Year Review for Former Mare Island Naval Shipyard, Vallejo, California, 2016 — present
<br />Ms. Martin provided primary authorship of the Five -Year Review Report, conducted site inspections, and inspections after a significant
<br />rain event. This project included preparation of a Five -Year Review Report, Levee and Institutional Control Annual Inspections and post -
<br />rain visual inspections.
<br />Munitions Response Program (MRP) Site 8 Land Use Control Remedial Implementation Plan (LUCIP) Development and Long -
<br />Term Management (LTM), Naval Base Coronado, California, 2017 — present
<br />Ms. Martin provided project management, primary report authorship, and oversight of subcontractor and unexploded ordnance (UXO)
<br />technician support. The project included a LUCIP for MRP Site 8, a legal survey and description for MRP Site 8, and UXO support for
<br />multiple sites.
<br />Closure Documentation at Multiple Solid Waste Management Units and Areas of Concern and Further Removal
<br />Action/Characterization Documentation at Naval Base Ventura County, Port Hueneme, 2016 — present
<br />Ms. Martin provided project support as an author of a Closure Recommendation Report for multiple solid waste management units
<br />(SWMU)/areas of concern (AOC) sites. The project included incorporating all previously existing and currently collected data for the sites,
<br />and providing an assessment and closure recommendations report, an engineering evaluation/cost analysis and action memorandum
<br />for up to 10 sites, and a sampling and analysis plan to support further characterization for up to 10 sites.
<br />IR Site 26 Groundwater Study, Hunters Point Naval Shipyard, San Francisco, CA, 2016 - present
<br />Ms. Martin provided primary authorship of the Preliminary Draft Work Plan and Sampling and Analysis Plan for this project. The project
<br />includes a Work Plan/Sampling and Analysis Plan; a health and safety plan; field work including baseline groundwater sampling, soil
<br />borings and sampling to support in situ stabilization (ISS) treatment, ISS treatment of dissolved mercury to reduce mercury in groundwater
<br />at IR Site 26, and post -treatment performance monitoring; and a RACR.
<br />Non -Time Critical Removal Action Performance Monitoring for Installation Restoration (IR) Site 1114, Marine Corps Base
<br />Camp Pendleton, California, 2014.2016
<br />Ms. Martin was the field team lead for this project, and was responsible for procurement of subcontractors and equipment, conducting
<br />and overseeing well development and the quarterly and semi-annual groundwater sampling at 10 wells, data analysis, and reporting. Ms.
<br />Martin provided primary authorship of the Preliminary Draft Performance Monitoring Report for this project, submitted in February 2016.
<br />The project included groundwater monitoring well installation and development of 10 wells, followed by quarterly and semi-annual
<br />groundwater sampling, data analysis, and reporting, to document the performance of a prior removal action and treatment for chlorinated
<br />volatile organic compounds in groundwater.
<br />Remedial Action at the Armitage Field and Area R Operable Unit, Naval Air Weapons Station China Lake, 2015
<br />Ms. Martin provided authorship of a site -specific health and safety plan for basewide groundwater sampling and assisted in coordinating
<br />field work and preparing groundwater monitoring reports. This project included groundwater monitoring and sampling at China Lake.
<br />Groundwater monitoring results were used in the preparation of quarterly and annual groundwater monitoring reports for several areas
<br />within the Site.
<br />Federal Facilities Support Remediation Agreement Program Support at Former Naval Station Treasure Island, California, 2014
<br />- 2015
<br />Ms. Martin provided authorship of the IR Site 21 RACR, including a statistical trend analysis of soil gas data. Ms. Martin provided
<br />authorship of the IR Site 24 Proposed Plan and the IR Site 12 Action Memorandum. In addition, Ms. Martin prepared responses to
<br />comments and document preparation support for the land use control (LUC) Inspection Reports. The project included the preparation of
<br />an Action Memorandum for IR Site 12 for performing a Time -Critical Removal Action; a RACR for IR Site 21; a Proposed Plan for IR Site
<br />24; LUC inspections and reporting for IR Sites 21, 27, and 30; and GIS support.
<br />Service Disabled Veteran Owned Small Business
<br />
|