My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KMEA
Clerk
>
Contracts / Agreements
>
K
>
KMEA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:45:07 PM
Creation date
10/8/2018 1:58:05 PM
Metadata
Fields
Template:
Contracts
Company Name
KMEA
Contract #
A-2018-190
Agency
PUBLIC WORKS
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
5/19/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ll LMEAel <br />Peter Ghiularrlila EIT <br />Support Staff Phase I ESAs <br />Mr. Ghiulamila is an environmental engineer with over 5 years' experience working on a variety of projects including Phase I and II <br />Environmental Site Assessments. He has performed multiple Phase I and 11 site inspections and reports in San Diego and Orange County. <br />Mr. Ghiulamila has a fundamental understanding of Environmental, Health and Safety Compliance and a keen attention to detail. He has <br />consulted with multiple municipalities and agencies including the County of Orange, Mesa Consolidated Water District, and the City of <br />Huntington Beach. <br />Education <br />❖ Bachelors of Science in Environmental Resources Engineering, Humboldt State University, CA <br />➢ Emphasis on Surface Hydrology and Numerical Modeling of Environmental Systems 2010 <br />Current Professional Registrations <br />❖ California Certified Engineer -In -Training; CA-EIT Certification #135769, 2009 <br />❖ Qualified Industrial Stormwater Professional (QISP), 2016 <br />f• 40 Hour OSHA HAZWOPER Training, Present <br />f• First Aid / CPR Certification, Present <br />Publications <br />Nez Perce Soil and Water Conservation District Well Monitoring Report, 2015. <br />❖ Influence of Fish Passage Retrofits on Culvert Hydraulic Capacity, 2009. <br />General Experience <br />March 2017 • Present Environmental Engineer <br />Stormwater Management Site Lead for a contracted federal compliance project. Providing ongoing support to multiple Stormwater <br />Compliance projects throughout Southern California. Responsible for stormwater inspections, sampling, and reporting for a large military <br />base near Oceanside, CA. Assisted with project proposals and sub -contractor quotes. Gauged approximately 100 groundwater <br />monitoring wells and sampled multiple extraction wells. Assisted in maintaining landfill flares and monitoring sub -surface methane <br />concentrations. <br />2015 — 2016 Assistant Director of Maintenance Services/Stormwater Consultant <br />Accountable for environmental compliance, hazardous waste management, and employee oversight of the maintenance department and <br />field operations. Managed and performed stormwater inspections and maintenance of municipal and residential stormwater infrastructure <br />throughout Southern California. Assisted in the design phase of underground treatment vaults to ensure dimensions are adequate for <br />maintenance and egress. <br />2014 — 2015 Restoration Project Assistant <br />Supported project planning and implementation for salmon habitat restoration on tributaries of the Clearwater River. Select tasks include: <br />• Authored groundwater monitoring report for regions of Nez Farce, Latah, and Whitman Counties to investigate impacts of crop <br />and rangeland management techniques upon the groundwater quality. <br />• Inspected and reported on culvert maintenance issues for rural and urban tributaries. <br />• Installed and maintained remote weather stations on tributaries of the Clearwater River. Responsible for data acquisition and <br />analyses. <br />• Assisted with flood plain analysis using HEC-RAS to investigate channel modification effects on sensitive biological habitat. <br />• Supervised a field crew of 12 contracted laborers working on a riparian restoration projects. Responsible for ensuring deadlines <br />are met and BMPs are adhered to. <br />
The URL can be used to link to this page
Your browser does not support the video tag.