My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DUDEK
Clerk
>
Contracts / Agreements
>
D
>
DUDEK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2018 4:35:25 PM
Creation date
10/8/2018 4:33:32 PM
Metadata
Fields
Template:
Contracts
Company Name
DUDEK
Contract #
A-2018-223
Agency
PUBLIC WORKS
Council Approval Date
9/18/2018
Expiration Date
9/17/2020
Insurance Exp Date
1/1/1900
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />Dudek has reviewed the standard agreement (Attachment 2 of the RFP) and takes no exceptions to <br />the contract. <br />1.0 Firm and Team Experience <br />The Dudek team is experienced in lake planning, rehabilitation, <br />and design with team member experts in CEQA compliance, <br />resource agency permitting and fisheries, lake design, water <br />quality and treatment systems, site grading and site design, pump <br />station design, and soils and geology. Led by proven, experienced <br />project manager, our project team presents a unique ability to find <br />practical, timely, and cost effective solutions to the City's project <br />challenges. <br />Dudek at a Glance <br />A Employed owned firm <br />founded in 1980 <br />12 California offices <br />including a local Orange <br />County office in San Juan <br />Capistrano <br />450+ multi -disciplinary <br />Dudek will serve as the prime consultant providing overall professionals <br />management, engineering, and planning services, and will be . Top 150 US Environmental <br />responsible for coordinating with the City. Jonls Smith, PE, CFM, Firm (Engineering News - <br />has over 23 years of experience in the design of lakes, ponds, and Record) <br />basins. Bob Ohlund, PE with over 34 years' of experience in the <br />industry will serve as Principal -In -Charge ensuring the City that all available resources are being used <br />to complete the project on time and budget, The management team Is supported by a qualified group <br />of engineers and environmental permitting and agency experts. This team recently completed the <br />Centennial Park Lake Circulation and Rehabilitation Project Manual. <br />The project team will be comprised of the fallowing key individuals, with staffing functions as indicated <br />in Figure 1. Qualifications, experience, and availability for our key team members are presented on <br />the following page and resumes for all staff are provided in Appendix A. <br />FIGURE 1. PROJECT ORGANIZATION CHART <br />Joels Smith, PE, CPM r-1 Eob ohlund, PE <br />LEAD INOINIER <br />PUMP VAULT VISION <br />TREATMENT SYSTIM option <br />Lm MNE, PE <br />Neil Harper, PE <br />Greg Gulllen, PhD, PE <br />NSNIRYISTAILIMMINT <br />OEOA DOCUMENTAWON AND <br />PUOWAIRD AAN4TUMpV WANG <br />MOMAN44AMENT <br />RMOURCE AGENCY PERMITTING <br />AND IMITAT DESIGN <br />Craig soltenrich <br />Collin Ramsey, LEEP GA <br />Stu Fraser, NLA <br />AnitD. Hayworth, Phi) <br />99IEWEDU4ATIONAL <br />PU04141iRALTH N AAFITY <br />MGNMI VISION <br />liaitlln lively <br />Wants CAL DESIGN <br />Todd Anderson <br />Scott Nelson, PE <br />MPrAas/Phom & Assoelates <br />DUDEK Proposal for Centennial Lake Renovation 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.