My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DUDEK
Clerk
>
Contracts / Agreements
>
D
>
DUDEK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2018 4:35:25 PM
Creation date
10/8/2018 4:33:32 PM
Metadata
Fields
Template:
Contracts
Company Name
DUDEK
Contract #
A-2018-223
Agency
PUBLIC WORKS
Council Approval Date
9/18/2018
Expiration Date
9/17/2020
Insurance Exp Date
1/1/1900
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
switch or by unplugging from a receptacle. The <br />sump pump will have an integral float switch for <br />on/off function and can be removed from power by <br />unplugging from a receptacle, <br />STATEMENT OF QUALIFICAITONS <br />Fountain Jet Accent Lighting: Accent lighting will <br />be incorporated into the design of the proposed <br />fountain water feature to be located near peninsula. <br />The accent lighting will be powered from at - <br />protected submersible power cable fed from an <br />existing load center that will run along the bottom of the lake. The light can <br />be controlled with a lighting control panel with either programmable timer <br />or a photocell so that the lights will come on at dusk and turn off at dawn. <br />We will work with the City to develop a control strategy for the lighting. <br />Examples of fountain jet accent <br />and lighting. <br />The Design Development phase will also Include 60% complete design for the Biological Water <br />Quality Control System including: <br />• Submerged biological filters, <br />• Vascular vegetation wetland planters, <br />• Aquatic vegetation planters, <br />• Fishery management plan, <br />• Waterfowl management plan, and <br />• Wildlife management plan <br />The Design Development phase will also <br />include 60% complete design for the <br />Environmental Water Quality Control System <br />including <br />• Waterfowl habitat island grading, <br />• Waterfowl habitat island planting palette <br />• Waterfowl habitat island irrigation plan <br />• Lake fishery stocking plan <br />• Lake area vector control plan, <br />• Lake maintenance plan. <br />• Lake area trash management plan <br />sur design pians will include grading design and a plant palette <br />developedbyourlb-house waterfowl specialist restoration <br />ecologist, and a landscape architect to create a habitat and an <br />environment that Is favorable to native waterfowl. <br />The socio -behavioral water quality system includes elements intended to modify behavior of park <br />users in a way that results in better water quality. The Design Development phase will include 60% <br />complete design for Socio -Behavioral Water Quality System including: <br />• Informational/educational signage, <br />• Docent program planning, <br />• Maintenance activity planning <br />DUDEK Proposal for Centennial Lake Renovation 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.