Laserfiche WebLink
TABLE 4. ADDITIONAL COMMUNITY LAKE EXPERIENCE <br />STATEMENT OF QUALIFICAITONS <br />Harveston Lake <br />:, A 30 -acre lake In Harveston Lake Park in Temecula <br />Charlan Rd Seasonal Storage <br />r Dudek designed the Charlan Road Seasonal Storage Facility.The <br />Ponds <br />Charlan Road SS facility includes a 48 acre-foot recycled water storage i <br />Valley Center Municipal Water <br />District <br />1reservoir. The lined, earthen berm reservoir will be constructed on five <br />acre parcel with berm heights up to 22 -ft above surrounding grade. The <br />FernandoCariilo, 761.749.1600 <br />1 project required extensive soil remediation to mitigate underlying loose <br />Design completed May 2015 <br />1 alluvial soils and will import over 50,000 cubic yards of material. An <br />fThe Lakes CountryClub Sunrise Company <br />onsite vertical turbine pump station, metering facility, and post -storage <br />Palm Springs, CA <br />strainer will be constructed to Integrate the offline storage facility Into the <br />East Highland Ranch, East Highland Ranch, Inc. Study and rehabilitation design of existing lake for this I <br />Districts existing recycled water distribution system, serving primarily <br />[ Mobil Oil Company community development <br />the neighboring Woods Valley Golf Course. <br />Victoria Basin Recharge Pond <br />____ ____ - ------ <br />Dudek contracted with the District to design of the Victoria Water <br />Western Municipal Water <br />Recharge Facility. Ongoing effort have Included the Victoria site <br />District <br />configuration, permitting, stormwater capture facilities, and ancillary <br />Fakhd Manghl, 951.5717277 <br />equipment. A variety of site configurations have been developed, each i <br />Design completed May 2015 <br />evaluated to determine its stormwater capture capacity, long-term <br />j sedimentation characteristics, and ongoing operation and maintenance <br />characteristics. Currently, the 10 -acre Victoria site is projected to be <br />capable of recharging the Arlington Basin In excess of 3;000 acre-feet <br />I per year. The facility is projected to be constructed in 2018, and <br />recharging the Arlington Basin by December 2018. j <br />TABLE 4. ADDITIONAL COMMUNITY LAKE EXPERIENCE <br />DUDIEK Proposal for Centennial Lake Renovation 18 <br />Harveston Lake <br />:, A 30 -acre lake In Harveston Lake Park in Temecula <br />Temecula, CA <br />Lake #9 Trump National Golf Club <br />Design of Lake feature on #9 Hole on Ocean Trails Golf <br />Rancho Palos Verdes, CA <br />i Course, currently known as Trump National Golf Club <br />Lake Mission Viejo <br />A 120 -acre recreational lake, lake edge and lining design <br />Mission Viejo, CA <br />fThe Lakes CountryClub Sunrise Company <br />22 lakes with combined water surface areas of 25 acres <br />Palm Springs, CA <br />I featuring waterfalls and golf course development <br />East Highland Ranch, East Highland Ranch, Inc. Study and rehabilitation design of existing lake for this I <br />San Bernardino, CA <br />[ Mobil Oil Company community development <br />Harbortown, Vintage Properties <br />A 2.6 acre lake for Mariner's Island townhouse project <br />San Mateo, CA <br />Vintage Parcel 11, Vintage Properties <br />Five (5) small lake systems featuring biofllter and aeration <br />; Palm Desert, CA <br />1 systems <br />Woodlakes, C. Robert Langslet & Son <br />Waterscape system features spectacular entry waterfall <br />Santa Ana, CA <br />DUDIEK Proposal for Centennial Lake Renovation 18 <br />