Laserfiche WebLink
NEIL HARIaER, PEā€”CONI'INUED <br />within the percolation basins and pumping forebay, a high spot in the pump station discharging piping was <br />required to fadliate proper operation of the pump station under the full range of operating condictions, <br />San Jacinto Valley Enhanced Recharge & Recovery Program, Eastern Municipal Water Department, <br />San Jacinto, California, Lead engineer responsible for the prelimnary design of a treatment facility for <br />Iron and manganese removal, blending, disinfection, and storage of extracted groundwater, The <br />centralized treatment facility was designed to process up to 16,300 -glom from the proposed eleven <br />groundwater extraction wells constructed across three phases. The design includes chemical oxidation of <br />the iron and managenes for removal by medla filtration, Treatment system also Inlcudes the application of <br />a blending strategy to mix high quality water (low iron and manganese concentration) with poor quality <br />water (high iron and manganese concentrations). <br />LLWRF Recycled Water Reservoir and Percolation Basins, Lee Lalce Water District, Corona, <br />Riverside County, California. Project Manager for design of the 2 -MG recycled water reservoir with <br />liner and floating cover, relocated 1,600-gpm booster pump station, 10 -ft diameter clearwell, 2 percolation <br />basins totaling 2.5 -acres in surface area. Project also includes multiple 12 -inch and 18 -Inch pipelines to <br />fill/drain reservoir and fill the percolation basins, and perimeter and basin maintenance access roads. <br />Placentia and Raymond Basins Feasibility Study, Orange County Water District, Anaheim, <br />California, Project Engineer for preliminary pump station design that included preparation of system <br />head curves (full and empty basin condition) for each basin, pump selection, preparing construction cost <br />est mates, sizing electric service, preparing preliminary submersible pump station configurations (including <br />detailed sump layouts with piping/vaSve configurations), preparing preliminary site plans, and composing <br />pertinent sections of the feasibility study. <br />Upgrades to Mangular Blend. Station, City of Corona, Riverside County, California, Project Manager <br />for design of nitrate blend station facility, which included a 2,000-gpm, 125 -hp vertical turbine purnp in <br />vault flow metering fadlities, facility piping (12 to 24 inch), nitrate blending facilities, nitrate sampling and <br />analyzers, flow control and pressure -reducing valve vault, electrical service, motor control center, non- <br />automatic transfer switch, PLC/SCADA system, radio telemetry, and miscellaneous site upgrades, <br />Perimeter Booster Pump Station Upgrades, San Bernardino Municipal Water Department, City of <br />San Bernardino, San Bernardino County, California. Project Manager for preliminary and final design <br />of a 100 -hp vertical turbine pump, discharge piping and valving, 100 -hp solid state soft starter, 250 -kW <br />generator set, and a 600A automatic transfer switch. The 100 -hp pump was required to pump to the <br />Interim and future hydraullc grades which differed by approxlmtely 25 -ft and hydraulic calculations had to <br />be prepared to determine the impacts to the (2) existing pumps for both of the hydraulic scenarios. The <br />project also required enlarging the pump station enclosure to accommodate the generator and consisted <br />of additional concrete black wall, relocating a 10 -ft gate and asphalt paving. <br />Camino Real Booster Pump Station, City of Arcadia, Los Angeles County, California. Project <br />Engineer for design of a 4,700 -glom booster pump station comprised of a (3) 2,350-gpm 125 -hp vertical <br />turbine pumps (2 duty and 1 standby) in a CMU block wall building. Other facilities included a MCC, <br />overhead monorail crane, surge anticipator valve, standby generator set, SCADA/Telemetry, 600A electric <br />service, and a flow metering vault, Site improvements consisted of approximately 500-3f of 18 and 24 -inch <br />yard piping and site grading/paving. Site demolition included demolition of an existing well. <br />DUDEK Page 2 of 2 <br />