My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TERRACON CONSULTANTS, INC.
Clerk
>
Contracts / Agreements
>
T
>
TERRACON CONSULTANTS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2019 9:11:39 AM
Creation date
10/8/2018 4:33:36 PM
Metadata
Fields
Template:
Contracts
Company Name
TERRACON CONSULTANTS, INC.
Contract #
A-2018-192
Agency
PUBLIC WORKS
Council Approval Date
8/21/2018
Expiration Date
8/20/2021
Insurance Exp Date
1/1/2020
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental m Facilities v Geotechnical at Materials <br />Approach to Meeting Your Needs and Statement of Proposed Services (by Task) <br />Terracon approaches each project, from minor asbestos, lead and mold surveys to indoor air <br />quality and complex hazardous materials and industrial hygiene projects, with the four -phased <br />methodology outlined below. <br />6 •Investigation M <br />• Proposed Work Plan •Site Visit • Written Procedures • Clearance Sampling <br />•Sampling Plan • Investigation Report • Abatement Specifications •Summary Letter <br />• Meetingspaining • Training Certificate <br />Our professionals are experts working through all phases of work including initial survey and <br />design, pre-bid phase, construction phase and project close-out. We work as a team, <br />collaboratively with architects, construction mangers, general contractors, abatement firms, <br />public agency representatives and others. Careful collaboration ensures we select the <br />appropriate project approach that will comply and ultimately be well received by project stake <br />holders and comply with all requirements of the program while allowing flexibility in adapting to <br />changing needs, design alterations and priorities of a public agency. Additionally, we have one <br />of the largest staff of certified personnel in California which allows us to meet aggressive <br />schedules and manage multiple projects concurrently. <br />Below, we have outlined the tasks necessary for successful completion and deliverables for this <br />contract. <br />• Task 1 — Record Review <br />• Task 2 — Asbestos Survey <br />• Task 3 — Lead Survey <br />• Task 4 — Mold Survey <br />• Task 5 — PCB Survey <br />• Task 6 — Other Hazardous Material Testing <br />• Task 7 & S — Report Preparation and Distribution <br />• Task 9 — Abatement Work Plan / Specifications and Cost Estimate <br />• Task 10 — Consultation and Abatement Monitoring <br />Assumptions and/or Constraints <br />Terracon assumes our hazardous material/environmental services will typically be part of larger <br />construction projects. However, we can also provide these services for the purposes of due <br />diligence for project planning or property acquisition. <br />itCity of Santa Ana Public Works Agency— Various Environmental Services (RFP No. 18-043) <br />— A2 Hazardous Materials Surveys <br />
The URL can be used to link to this page
Your browser does not support the video tag.