Laserfiche WebLink
Environmental a Facilities a Geotechnical a Materials <br />MICHAEL JARBOE, CSST, CDPH LEAD DSUckCommunityCollege, <br />Mission Viejo, California, !, <br />PROJECT STAFF Environmental Studies <br />Mr. Mike Jarboe is an Industrial Hygienist in Terracon's Colton <br />and Orange County offices. He specializes in conducting <br />industrial hygiene field investigations. and works directly with <br />project managers to provide professional environmental services <br />for public and private clients. <br />CERTIFICATIONS <br />Certified Site Surveillance <br />Technician, # 10-4639 <br />CDPH Lead Inspector/Assessor <br />and Project Monitor, #19934 <br />• HAZWOPER <br />• NIOSH Course 582E <br />Mr. Jarboe Conducts visual surveys and bulk sampling of ! YEARS WITH TERRACON: 15 i <br />suspected hazardous materials, prepares detailed field reports, provides contractor oversight, <br />and conducts air monitoring and clearance inspection sampling for hazardous materials during <br />construction and renovation projects. Combined with his educational training and work related <br />experiences, Mr. Jarboe has extensive knowledge of federal, state and local regulations. <br />PROJECT EXPERIENCE <br />BASSET UNIFIED SCHOOL DISTRICT I LA PUENTE, CA <br />Certified Site Surveillance Technician and Lead Inspector/Assessor responsible for pre - <br />renovation hazardous materials survey, including asbestos and lead sampling, at Basset High <br />School. <br />TORRANCE UNIFIED SCHOOL DISTRICT I TORRANCE, CA <br />Industrial Hygienist responsible for conducting AHERA 3 year re -inspections for Torrance <br />Unified School District campuses and facilities in 2006. <br />HILLWOOD INVESTMENTS I ONTARIO, CA <br />Industrial Hygienist responsible for comprehensive asbestos, lead-based paint and universal <br />waste (PCB's, mercury switches, plus any other hazardous material) at the former Jacobs <br />concrete casting facility on Ontario Mills Pkwy. in Ontario. The facility is scheduled for <br />demolition and development into a 500,000 -square -foot warehouse facility. <br />JC PENNEY I VARIOUS LOCATIONS, CA <br />Industrial Hygienist responsible for limited asbestos survey to support a HVAC replacement <br />project in Palm Desert, CA. He also provides asbestos abatement monitoring for multiple waves <br />of remodeling for sites in Orange, CA and West Covina, CA. <br />SEARS HOLDING COMPANY I ORANGE, CA <br />Mr. Jarboe performed contractor surveillance during asbestos removal at the Sears Orange <br />location continuously for 4 months during night shifts starting at 9:00 pm and running until 6:00 <br />am. The store is being completely remodel in preparation for the addition of a 24,000 24 Hour <br />Fitness complex. The abatement included floor tile and mastic, drywall and joint compound and <br />ceiling tile plus mirror mastic throughout the store. Mr. Jarboe also performed PCM air sample <br />analysis on samples collected during the removal and for clearance at the end of each shift. <br />UNIVERSAL NBC I BURBANK, CA <br />Industrial Hygienist responsible for comprehensive asbestos, lead-based paint and universal <br />waste (PCB's, mercury switches, plus any other hazardous material) at the Universal -NBC <br />facility as well as contractor surveillance during asbestos, lead-based paint and hazardous <br />materials remediation for the current renovation of the entire facility. <br />1rCity of Santa Ana Public Works Agency — Various Environmental Services (RFP No. 18-043) <br />A2 — Hazardous Materials Surveys <br />