Laserfiche WebLink
138107TAr '* mkol <br />Task 4: Proofcheck EIR Addendum <br />PlaceWorks will edit the Screencheck EIR Addendum upon receipt of review comments from City staff <br />within two weeks of receipt. We anticipate that City staff will provide one compiled set of comments. We <br />also anticipate that there will be no substantive changes to the proposed site plan or the project <br />description and no new or additional modeling required for the technical studies. The revised version of the <br />Addendum will be submitted to the City in track changes for review to ensure that all comments have been <br />addressed. This proofcheck document will include how/where staff comments on the screencheck <br />Addendum have been addressed. <br />Task 5: Final EIR Addendum <br />Revisions to the Screencheck EIR Addendum will be completed by PlaceWorks based on the City's one <br />round of staff review comments. We anticipate that city staff will provide one compiled set of comments. <br />We anticipate there will be no substantive changes to the proposed site plan or the project description and <br />no new or additional modeling required for the technical studies. <br />PlaceWorks will edit the Screencheck EIR Addendum upon receipt of review comments from City staff <br />within two weeks of receipt. We anticipate that City staff will provide one compiled set of comments. We <br />also anticipate that there will be no substantive changes to the proposed site plan or the project <br />description and no new or additional modeling required for the technical studies. The revised version of the <br />Addendum will be submitted to the City in track changes for review to ensure that all comments have been <br />addressed. This proofcheck document will include how/where staff comments on the screencheck <br />Addendum have been addressed. A Mitigation Monitoring Program would also be prepared based on <br />Mitigation Monitoring Program No. 085c. <br />Task 6: Mitigation Monitoring and Reporting Program and Notice of Determination <br />PlaceWorks will prepare a Mitigation Monitoring and Reporting Program (MMRP) based on applicable <br />mitigation measures from the TZC EIR and pursuant to Section 21081.6 of the CEOA Public Resources Code. <br />The MMRP will be defined through working with City staff to identify appropriate monitoring <br />steps/procedures in order to provide a basis for monitoring such measures during and upon project <br />implementation. The MMRP will be based on the MMRP for the TZC EIR. If the EIR Addendum determines <br />that previously adopted mitigation measures in the TZC EIR are adequate to mitigate the environmental <br />impacts of the Proposed Project, no updated MMRP will be necessary. <br />Task 7: Meetings <br />PlaceWorks staff will attend one kick-off meeting with the City and the applicant to discuss the project <br />approach and schedule. <br />Our scope of work and cost estimate assume up to 28 hours of meeting attendance by PlaceWorks' project <br />director and/or project manager, as outlined below. Additional meeting participation at the City's request <br />will be billed on a time -and -materials basis in accordance with the hourly rates for the personnel involved, <br />as included in this proposal. <br />2501-23 <br />