My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - GEOTECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
25B - AGMT - GEOTECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:16:31 PM
Creation date
11/15/2018 9:12:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERALCHARGES <br />• RMA Group requires twenty-four(24) hour prior notification for scheduling inspectors and/or technicians. <br />• Inspection charges start at the scheduled show up time at the job site. All inspection hours will be billed in the following <br />increments: <br />• There will be a Minimum two (2) hour charge for any RMA Group employee presence on site. <br />• Any time less than four (4) hours of work will be billed as four (4) hours. <br />• Four (4) to eight (8) hours will be billed as eight (8) hours. <br />• When personnel are required to work in excess of 5 hours without an uninterrupted meal period of 30 minutes, due to project <br />constraints, K hour will be charged at double time rates in addition to any applicable hours worked. <br />• Rates are valid through June 30, 2019. Rates for personnel will increase by 3% per year on July 1st of each subsequent year. <br />• Administrative/clerical support will be charged at 5% of the monthly direct charges. <br />• Certified Payroll Reports will be prepared upon request. There will be a $75.00 charge for each certified payroll report. <br />• Outside services will be billed at cost plus 15% unless billed directly to and paid for by Client. <br />• Requests made by client for management attendance at meetings at the project site will be charged at standard rate. <br />OVERTIME CHARGES <br />• Work performed in excess of 8 hours per day and / or up to eight (8) hours on Saturdays will be billed at 1.5 times the unit rate. <br />• Work performed on Sunday, recognized holidays, or in excess of eight (8) hours on Saturdays will be billed at 2.0 times the unit <br />rate. <br />• A 20% surcharge will be applied for laboratory tests performed an a Saturday or Sunday. <br />PER DIEM AND TRAVEL CHARGES <br />• An $85.00 charge per day will be applied when our personnel are required to stay overnight at remote locations. <br />• Time will be billed at the unit rate while traveling to a remote location or if a location requires an overnight stay <br />Mileage for travel outside a 50 mile radius from either the project site or the nearest RMA facility whichever is closest, will be <br />charged at a rate of $0.55 per mile. <br />NIGHT WORK <br />• A $10.00 per hour surcharge will be added to all personnel rates for work performed during night shifts. <br />WRMA Group <br />EvervProiett Matters w .rmvtomoonles.com <br />CITY OF SANTA ANA I PUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICESI Page 10 <br />25B-138 JULY 12.2018119-1052-P <br />
The URL can be used to link to this page
Your browser does not support the video tag.