Laserfiche WebLink
INN <br />BID 1. STATEMENT OF QUALIFICATIONS <br />c. Firm and Team Experience <br />EDUCATION <br />+ University of Arizona, BS, Geological Engineering <br />j LICENSES & CERTIFICATIONS <br />+ State of California Geotechnical Engineer #2767 <br />+ State of California Professional Engineer #64301 <br />+ Nuclear Gauge Operator Certification <br />r <br />MEMBERSHIPS & ASSOCIATIONS <br />+ American Society of Civil Engineers (ASCE) <br />+ Society of American Military Engineers (SAME) <br />+American Public Works Association (APWA) <br />EXPERIENCE & RESPONSIBILITIES <br />Emil has 20 years of experience providing geotechnical <br />observation and testing services for a wide range of <br />educational projects. He provides oversight and i <br />management of geotechnical and material testing <br />inspection teams during design and construction, <br />projects. His duties include the oversight of <br />geotechnical and forensic evaluations including the. <br />review of field exploratory data to interpret subsurface <br />geologic conditions, geotechnical calculations, review <br />of temporary shoring systems, and the review of, <br />geotechnical reports and distress surveys of slopes, <br />excavations, buildings, pavements, retaining walls and <br />other improvements. During construction, he reviews <br />earthwork compliance, manages special inspection <br />and testing contracts, and provides SCST with quality <br />reviews and technical advice. Emil's duties will consist <br />of aiding in project management duties, including <br />review of construction plans and specifications, <br />attending jobsite meetings, preparation of engineering' <br />reports and proposals, and reviewing and reporting <br />test results. <br />PROJECT EXPERIENCE <br />+Arlington Drive Bioswale and Dry Weather <br />Diversion Project, Costa Mesa, CA: Technical <br />advisor during a geotechnical investigation for the <br />removal of 70,000 SF of asphalt, and the design <br />and construction of a landscaped linear park with a <br />vegetated bioswale, which will be approximately 2,500 <br />linear feet, and decomposed granite multipurpose <br />bike/walking trail, which will be approximately one <br />mile long. The removal of the asphalt will also result <br />in the loss of on -street parking, so the project will also <br />include a street parking study and proposed street <br />parking layouts. The project is funded in part through <br />the Orange County Transportation Authority Measure <br />M2 Environmental Cleanup Tier 2 Grant Program. <br />+ LA Metro 1-605 and SR -91 Interchange Project, <br />Santa Fe Springs, CA: Project manager during a <br />geotechnical investigation for the Project Approval <br />and Environmental Documentation (PALED) phase of <br />the proposed $120 million project. The improvements <br />will include additional freeway mainline capacity <br />leading to westbound SR -91 connector ramp to the <br />northbound and southbound 1-605, improvements to <br />freeway westbound entrance and exit ramps on SR - <br />91, and operational improvements for the northbound <br />1-605 at Alondra Boulevard off -ramp. Associated <br />improvements are also anticipated on the arterial <br />streets in the vicinity of the freeway ramp intersections. <br />+ City of Carlsbad As -Needed Services Contract, <br />Carlsbad, CA: Project manager during geotechnical <br />investigations for pavement overlay projects, <br />replacement of the Simsbury Pipeline, and slope <br />distress on Old Rancho Santa Fe Road. Projects <br />including testing and inspection services included the <br />widening of EI Camino Real, Poinsettia Lift Station <br />Standby Pump Station, construction of the Tri - <br />Agencies Transmission Pipelines Reach 2 Phase 1, <br />and AC conformance testing. <br />+ City of National City On -Call Geotechnical, Soils, <br />and Materials Testing Services, National City, <br />CA: Principal engineer during testing and inspection <br />services widening of Plaza Boulevard and North <br />Avenue and upgrades at EI Toyon and Kimball <br />Parks, as well as geotechnical investigations for <br />improvements on 14th Street and Harding Avenue and <br />for the second phase of widening on Plaza Boulevard. <br />City of Santa Ana RFP No. 1M45, Geotechnical Engineering SenAces 25B-1 <br />5 _ 1 57 <br />SCST Proposal No. 1&0308 ` <br />