Laserfiche WebLink
1. STATEMENT OF QUALIFICATIONS <br />d. Understanding of Need <br />Testing, Field Work, and Reporting: The <br />assigned inspector or technician will report to the <br />appropriate on-site contact and sign -in if necessary. <br />We will provide Caltrans certified personnel when <br />applicable. The inspector or technician will meet <br />with the City's designated representative to review <br />the approved plans and specifications, and to assure <br />that these documents are clearly understood and the <br />City's needs are being fully addressed. <br />The inspector or technician will perform the required <br />inspection and/or testing service in accordance with <br />the approved project drawings and specifications. <br />Any required samples will be procured, labeled, <br />electronically logged, and scheduled for pickup. <br />Our Feld representative will document findings or <br />test results with a report of their daily activities and <br />the status of compliance with project requirements <br />and present the report or results to the City's <br />designated representative for a signature. The signing <br />representative, SCST's project manager and pertinent <br />project team members will then automatically receive <br />an email copy of the report or results. Notification <br />of any non-compliant work will be noted and clearly <br />reported to the City's designated representative. <br />SCST also utilizes Agile Frameworks MetaField® <br />V2.6 for our field reporting and testing, which allows <br />us to upload daily reports and testing results to a <br />central database from the field via cell phone where <br />they are reviewed by the project manager. Information <br />is then digitally signed and forwarded to the client, or <br />accessed by the client via a customer facing portal <br />via the cloud. Field inspection reports are typically <br />available the same day <br />Samples are delivered to our - <br />laboratory and are scheduled a "_^°,'..ax�m� a "_0_ ca r <br />for testing at required dates <br />by the appropriate testing <br />methods. Test results are <br />forwarded using MetaField <br />to SCST's project manager <br />for review and distribution. <br />Should testing result in non- <br />compliance, the designated <br />City representative is notified <br />immediately and a log of non- ; <br />conformance is automatically I ff <br />tracked per project using i <br />MetaField. <br />Laboratory Testing and Engineering Analysis: Our <br />team's project engineer will develop a geotechnical <br />engineering laboratory test program customized for <br />each project based on project needs, budget, and <br />subsurface conditions encountered during the field <br />exploration program. The analysis and laboratory <br />testing will be overseen by a California registered <br />professional engineer. <br />Preparation and Submittal of Deliverables: <br />SCST will present the City with a report that has <br />been thoroughly reviewed and checked for quality, <br />consistency, and accuracy by our project manager and <br />technical quality reviewer. A draft version of the report <br />is submitted for review and comment by the City so <br />that recommendations can be fine-tuned if necessary. <br />Our experience with municipal agencies has shown <br />us the importance of this step as communication with <br />the project team is streamlined. <br />NO DallyFleld Report <br />n r�mxwn mmaomu <br />.a�+agcuo,m 1z>.su, n+v+roa m4y.omn4µa <br />1m..mnxmam s.. o.c,.uemu ��a:mar.. <br />w n,nxm.ln osnrm ro.+x,�:.mem.xo.ow <br />TRMtLiO,ey+IVL RM om:o)ntmis <br />Aa Jp ft AW, moosr, <br />6911rb412. o5s.ypu,wom.,cm:m E.n.4{4atn401axY:e <br />om.. Mn1N Vb,:BM, <br />aLrlln•WAO uen..:lsw im M..sFam <br />aam n+ac sm,mu mrr..m a e„ma x n � 1v ea..um w n,. <br />SFb esmO wrtemma: npur 1.,.eo, <br />VO\N,vCbO LWM,M A. W,1Yd.Ia.1Cv4MYv mYhe191 <br />o.� <br />v,arc.ayaw,,,,e.a,,..., ro..w.aumamauxrn�svx�mar.y,.re..:weaaroruwm <br />.am.ncm,ammes..vnu.m,v:,muu.c.,ev. rx - aucwc.c®0 <br />o®a. venmq..wxnw 1sw...n,ay. osa�,.e000u.mure <br />vmm.venxyumamwmmm wn a.Rooa�m.aa.avµ....naa�aur., <br />VbMtlInNSVTY,gn,nao.amrm�..an W OSngpmOPemaN4Na <br />om.ru> ro <br />:m.mr++nsm.urrow,.row..oaom.xm+mnwrm.x eq., a1 <br />City of Santa Ana RFP No. 18-045, Geotechnical Engineering Services <br />SCST Proposal No. 18-0308 25B-1 <br />