Laserfiche WebLink
3, FEE PROPOSAL <br />TECHNICAL STAFF <br />TITLE <br />Principal Engineer/Geologist <br />HOURLY RATE <br />$174.00 <br />Senior Engineer/Geologist <br />$155.00 <br />Project Engineer/Geologist <br />$115.00 <br />Associate Staff Engineer/Geologist <br />$96.00 <br />Senior Soil Technician - Lab Only/Non-Prevailing Wage <br />$68.00 <br />Soil Technician - Lab Only/Non-Prevailing Wage <br />$60.00 <br />CADD Technician <br />$77.00 <br />Group 1 - Prevailing Wage <br />$98.00 <br />Group 2 - Prevailing Wage <br />$102.00 <br />Group 3 - Prevailing Wage <br />$106.00 <br />TITLE HOURLY RATE <br />Office Assistant $55.00 <br />Billino Administrator $55.00 <br />City of Santa Ana RFP No. 18-045. Geotechnical Engineering Services 25B-1 <br />_ 189 <br />SCST Proposal No..18.0308 ` <br />