My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - GEOTECH SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
11/20/2018
>
25B - AGMT - GEOTECH SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2018 9:16:31 PM
Creation date
11/15/2018 9:12:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25B
Date
11/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
accordance with ASTM standards; field technician services for observation, sampling, testing <br />and documentation during subgrade, aggregate base preparation, trench backfill, and place- <br />ment of asphalt concrete; batch plant inspection services which include observation, sampling, <br />and documentation during asphalt production at the plant. In addition, we provided laboratory <br />testing of soils, aggregates, asphalt concrete, and portland cement concrete which included <br />maximum density, optimum moisture content, R -value, extraction (% asphalt), asphalt concrete <br />maximum density, and concrete compressive strength. Ninyo & Moore also provided pick-up <br />and transportation of construction material samples for testing at our laboratory including field <br />samples and batch plant samples, preparation of daily observation reports and test data sheets. <br />Ninyo & Moore I Geotechnical Engineering Services I Pro250-960 July 12, 2018 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.