Laserfiche WebLink
After your project is completely installed, operational, and meets all requirements of the Program, which is <br />described in detail in the Customized Statewide Procedures Manual for Business and at <br />www.sce.com/customized—solutions: <br />• Complete, sign and submit the enclosed Customized Solutions Installation Report <br />• Submit final invoices and/or documentation to support project cost, clearly detailing all <br />costs associated with the project (equipment, labor, tax, etc.). <br />• Submit complete engineering calculations to demonstrate energy savings and <br />documentation, if applicable (including archival diskette, CD, etc.). <br />• Submit schematic drawings and/or manufacturer specification sheets, if applicable. <br />• Operating Report, if measurement and verification is required. <br />• Submit Pump Curve (if applicable) <br />• Submit Permit Closure for HVAC measures (if applicable) <br />NOTE: <br />As a reminder, the deadline for the project to be completely installed and operational is 24 months <br />from the date of this Project Approval letter. Please submit the completed Installation Report within <br />30 days after installation and prior to the two year deadline. <br />Payments of Incentives will be made only after all Program requirements are met by the Customer to <br />SCE's sole satisfaction. <br />1. All Projects and/or solutions must be completely installed and fully operational within 24 months <br />from the date the Project(s) is approved by SCE to be eligible for Incentive payments. SCE reserves <br />the right to cease making Incentive payment(s), require the return of the total or prorated Incentive <br />payment(s) and/or terminate this Agreement if the Project(s) is not completely installed and fully <br />operational within such 24 month period, unless an installation extension is granted by SCE, in SCE's <br />sole discretion, in writing. Any extension that is granted shall not exceed 6 months. <br />2. Prior to any extension being granted, SCE will reassess the Project(s) viability and the Customer <br />must provide reasonable assurance(s), at SCE's direction and in SCE's sole discretion that the Project <br />is progressing toward installation and fully operational status. Assurances include, but are not limited <br />to: (1) proof that the equipment was ordered; (2) a copy of the commissioning agent contract (when <br />applicable); (3) project implementation schedule; (4) written confirmation provided by the Customer <br />or Customer's Trade Professional that the project will be completed within the requested extension of <br />time. Additionally, after the initial 24 month period from SCE's approval of the Project, changes <br />impacting savings calculations or solution eligibility, such as Title 24, CPUC Energy Division <br />direction, etc., may cause SCE to revise the energy savings and Incentive amounts for which the <br />Customer is eligible. <br />3. SCE retains sole discretion to determine the appropriate baseline values and energy savings <br />calculations used to determine Incentive payments. Incentives shall only be paid on Projects that meet <br />or exceed the baseline performance standards applicable when this Agreement is signed. SCE <br />reserves the right to modify or cancel the Incentive amount if the actual solution installed (or the <br />actual energy savings resulting from such solution) differs from the installation as set forth in this <br />Agreement. <br />Check out www.sce.coml To see 2,gl -lg for the Comprehensive Bonus. (Rev. April 2017) <br />