Laserfiche WebLink
ENERGY <br />Vi <br />City of Santa Ana Public Works <br />Attn: John Aguilar/ Christy Kindig <br />714-647-5008 <br />Scope of Work — Ross Annex Parking Garage <br />Option A (Skyler Parking Garage Fixture 40W) - $36,986.50 <br />Estimated SCE Midstream Rebate - $1,040 (not Included In project cost) <br />RE T'R13 T C®. <br />SeAv orgy Sarirg .MMW <br />Based on the review of this project, Option A includes the requested Skyler Parking Garage Fixture <br />40W with. Integrated smart sensor. <br />• The base bid Includes removing and recycling all parking garage fixtures and Installing new <br />Skyler Parking Garage Fixtures. <br />• Twelve fixtures will be added to the overall total, which includes all new wiring and j boxes. <br />• Per Title 24 requirements, occupancy sensors will be commissioned on all Skyler Fixtures. <br />• Title 24 -certification forms MRCC-LTI will be followed and engineered by a CALTCP <br />Technician for this project. <br />Option B (J21Park 5 Parking Garage Fixture 33W) • $21,367.40 <br />Estimated SCE MidstPeam Rebate - $780 (not Included In project cost) <br />Based on the review of this project, Option B Includes the 121Park 5 Fixture 33W with Integrated <br />sensor. <br />• The base bid Includes removing and recycling all parking garage fixtures and installing new <br />J2 IPark 5 fixtures. <br />• Twelve fixtures will be added to the overall total, which Includes all new wiring and) boxes. <br />• Per Title 24 requirements, occupancy sensors will be commissioned on all J2 Fixtures. <br />• Title 24 certification forms NRCC-LTI will be followed and engineered by a CALTCP <br />Technician for this prosect. <br />