My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-081 - Environmental Review No. 2016-156
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2018
>
2018-081 - Environmental Review No. 2016-156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2019 9:47:57 AM
Creation date
11/29/2018 10:50:06 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2018-081
Date
11/20/2018
Destruction Year
P
Document Relationships
NS-2960
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2018 (NS-2935 - NS-2962)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program <br />Impacts Required Mitigation Measures Implementation <br />V. Cultural Resources <br />Items (b) and (c) <br />The Tustin Avenue Retail Development Project site <br />MMCR-l: Should poeviously unidentified historical, <br />Implementing Entity: Pmject applicant/ <br />will be graded pilot to construction, and if during <br />archaeological or paleontological resoumes be uncovered during <br />developer and culhsal resoumes expert <br />grading, it is revealed that previously unidentified <br />the couse of construction, grading/construction shall be halted <br />Monitoring Agency: City Santa Ana <br />a chaeolo ical, paleontological or geologic deposits <br />g p !e !T g p <br />in the ea so that the findings can be assessed. If it is <br />planning and Building Agency <br />an c <br />exist, an expert appropriate to the nature of the find <br />that <br />determined that more formal data collection is needed, a <br />i mon <br />must be afforded the oppoRunity to evaluate any <br />controlled excavation shall be required to adequately record the <br />Timing: Grading/construction phase <br />additional finds and to complete an analysis in <br />find and recover the associated materials in accordance with <br />accordance with CEQA guidelines, as amended. <br />CEQA guidelines, as amended. Excavating the materials in this <br />controlled mannerwill minimize the risk of any tesoumes being <br />lost, damaged or destroyed. <br />MM CR -2: Prior to the start of construction, the project <br />Implementing Entity: Project applicant/ <br />developer shall retain a Native American Monitor to conduct a <br />developer and Native American Monitor <br />Native American Indian Sensitivity Training for construction <br />MonitoringAgency: Ci of Santa Ana <br />g <br />pensonnel pilot to commencement of any excavation activities. <br />�' <br />a <br />Planning and Building Agency and Native <br />The training session shall include a handout and focus on how to <br />Ametican tribal group(s) <br />identify Native Ametican resoumes encountered during <br />earthmoving activities and the procedures followed if resoumes <br />Timing: Grading/consttuction phase <br />are discovered, the duties of the Native Ametican Monitot and <br />the general steps the Monitor would follow in conducting a <br />salvage investigation. The project developer shall retain a Native <br />American Monitor to be on-site during all project -related, <br />ground -disturbing construction activities (e.g., pavement removal, <br />auguring, boring, grading, excavation, potholing, trenching, and <br />grubbing) of previously undishsbed native soils. <br />MITIGATION MONITORING AND REPORTING PROGRAM <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.