My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT EV CHARGING STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
12/18/2018
>
25E - AGMT EV CHARGING STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2018 8:31:38 PM
Creation date
12/13/2018 8:27:10 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25E
Date
12/18/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VOLTAIC <br />••moron or <br />Nvca Varve G+n Cvw,uniunvne <br />Project#: 81-2078-D.1 <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of two (2) charging units to meet NEC requirements. <br />Supply and Installation of four (4) 40A circuit breakers for EVCS overcurrent protection. <br />o Utilization of existing electrical panels to supply four (4) 30A circuits to new charging units. <br />o From the electrical panel(s) to new charging stations, the new electrical conductors: #6 and #10 <br />ground wires. <br />Forming and pouring of concrete pad of dimensions per manufacturer's specifications for charging unit <br />structural support. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Supply and installation of four (4) bolt -down bollards for charging unit protection. <br />• Supply and mounting of four (4) bolt -down steel sign posts with EV parking signage. <br />• Stenciling/marking "EV CHARGING ONLY" for four (4) EV parking spaces. <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />• Placement of EMT, approximately +200'. <br />• Trenching and/or pneumatic boring, approximately+30' <br />• Concrete (demolition and repair) <br />IN MALS DATE <br />-13- <br />F >..v... •_.. 'f4 W"�.L-fit :.a:�`x.T-. �i .y` -4h. .:�.._�l. viSF.i1'�� �T.::S^ 5. 'w.'<<+ � .. �S .4�5 :�. -Tom.-.-D..31.va1 <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print Date. November 15 2018 <br />25E-20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.