Laserfiche WebLink
County of Los Angeles Department of Public Works, City of Los Angeles, LAUSD, and POLB. <br />He also serves as an expert witness for construction materials related issues on foren- <br />sics/litigation cases. <br />Our proposed Field Services Manager, who will be the single point -of -contact for the day-to- <br />day field activities, including scheduling our field material testing and inspection personnel, is <br />Mr. Steve Solis. Mr. Solis has more than 30 years of experience and holds various certifications <br />through Caltrans and the American Concrete Institute (ACI). As field services manager, he has <br />provided field services management for numerous soils and materials testing and inspection <br />projects, including the many of our current on-call contracts for as -needed geotechnical, mate- <br />rials testing and inspection services. His experience also includes managing field services for <br />other public agency on-call contracts, various cities and other county agencies. <br />Our Laboratory Manager will be Mr. James Dalgity. Mr. Dalgity is responsible for performing <br />quality control and quality assurance testing of soil, aggregate, asphalt, and concrete materials <br />in accordance with applicable ASTM, AASHTO, ACI, and Caltrans standards. As a technician, <br />Mr. Dalgity has extensive experience providing both field and laboratory testing of soils and <br />construction materials and maintains his current soils and materials testing certifications from <br />ACI and Caltrans. He provides geotechnical observation and testing services during earthwork <br />operations, including mass grading operations, trench and wall backfill, and roadway and build- <br />ing pad subgrade preparation. Mr. Dalgity also has experience in the requirements and <br />specifications in Greenbook for public works construction projects, as well as the requirements <br />of Caltrans for testing frequencies, test methods, and record keeping as described in Caltrans <br />Standard Specifications, Standard Special Provisions, and the Caltrans Construction Manual. <br />The proposed project team personnel are highly qualified and experienced <br />ciplines, and possess working knowledge of the required documents <br />following table includes the key personnel described above. The resum <br />personnel are provided in Appendix A. <br />Ninyo & Moore I Geotechnical Engineering Services I Proposal No, 04-01922 1 July 12, 2018 <br />in their specific dis- <br />and standards. The <br />es of the key project <br />