Laserfiche WebLink
Orange County Public Works, On -Call Materials Testing Services <br />Client: Orange County Public Works <br />1152 E. Fruit Street, Santa Ana, California 92701 <br />Contact: Ms. Hualin Hsu-Wingard; (714) 647-39643 <br />Dates: 2013-2016 <br />Ninyo & Moore was retained to provide geotechnical, materials testing & inspection services for <br />various capital improvements projects in the County of Orange. Below a few of the recent pro- <br />jects Ninyo & Moore has provided services to the County of Orange on: <br />Three task orders under this contract included 1) materials testing services for the Lincoln Ave- <br />nue Bridge widening in Anaheim; 2) Lambert Road Bikeway project where Ninyo & Moore <br />managed, scheduled and oversaw the sub -consultant's work for Failing Weight Deflection <br />(FWD) Testing on Lambert Road and the QA of testing data and the final reports prepared by <br />sub -consultant, Dynatest; and 3) Low Impact Development (LID) retrofit that involved percola- <br />tion testing at the Osborne and Gates buildings and parking structure at 300 and 320 North <br />Flower Street in Santa Ana. The purpose of our testing was to evaluate the percolation rates of <br />the soil at locations selected by the County of Orange to assist in the design of a possible storm <br />water runoff infiltration system. <br />As -Needed Construction Materials and Soils Testing Services <br />Client: City of Brea <br />1 Civic Center Circle, Brea, California 92821 <br />Contact: Mr. Steve Kooyman; (714) 990-7657 <br />Dates: 2011 -2014 <br />Ninyo & Moore was retained to provide on-call construction materials and soils testing services <br />during the various construction and reconstruction projects for the City of Brea. Our geotech- <br />nical engineering staff, as well as field testing personnel, worked closely with the City of Brea <br />Public Works staff to see that each project is constructed in accordance with the approved doc- <br />uments. We have provided geotechnical engineering and construction materials and soils <br />testing services for various roadway reconstruction and new pipeline installation projects, as <br />well as geotechnical and materials testing services for The Tracks at Brea — Segment 3 project. <br />Ninyo & Moore's construction materials and soils testing services included project coordination <br />and management to assist the City in maintaining each project's fiscal budget, as well as review <br />of each project's field density testing and laboratory test results. The purpose of our services <br />was to assist the City with checking to see that the construction was performed in accordance <br />with approved plans and specifications, as well as governing standards. <br />We have provide construction materials and soils testing services for the various projects in- <br />cluding the Elm Street Resurfacing and Waterline Replacement Project, Infiltration Testing City <br />Maintenance Yard Project, War Memorial Structure Project, Master Plan Sewer Upgrade Phase <br />4 Project , Birch Street Median Enhancement Phase 1 Project, and the Birch Street Median En- <br />hancement Phase 2 Project. <br />Geotechnical Engineering, Materials Testing, Construction Observation and Inspection <br />Services for Improvement Projects at John Wayne Airport <br />Client: John Wayne Airport/County of Orange <br />3160 Airway Avenue, Costa Mesa, CA 92626 <br />Contact: Mr. Larry Serafini, Deputy Airport Director (949) 252-5270 <br />Dates: 2003 - On-going <br />Ninyo & Moore was retained by John Wayne Airport to provide as -requested geotechnical engi- <br />neering, materials testing, and special (deputy) inspection services for various Airport <br />improvement projects, including the key Terminal C expansion project. The terms of the con- <br />Ninyo & Moore I Geotechnical Engineering Services I Proposal No. 04-01922 1 July 12, 2018 11 <br />