My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (7)
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 10:42:55 AM
Creation date
1/15/2019 12:19:20 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY
Contract #
A-2018-295
Agency
PUBLIC WORKS
Council Approval Date
12/18/2018
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />F1 <br />17 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />ICS <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />JAN 14 2019 <br />tR1 i <br />,, cuted Copy ta"COT <br />IW.Svl3 <br />AMENDMENT NO.3 TO <br />COOPERATIVE AGREEMENT NO. C-5-3583 <br />BETWEEN <br />w <br />G �' u <br />ORANGE COUNTY TRANSPORTATION AUTHORITY <br />AND <br />CITY OF SANTA ANA <br />FOR <br />THE DESIGN PHASE OF THE OC STREETCAR PROJECT <br />THIS AMENDMENT NO. 3 is effective this day of <br />om <br />and between the Orange County Transportation Authority, 550 South Main Street, P.O. Box 14184, <br />Orange California 92863-1584, a public entity of the State of California (hereinafter referred to as <br />"AUTHORITY), and the City of Santa Ana, a charter city and a municipal corporation (hereinafter <br />referred to as "CITY"), each individually known as "Party" and collectively referred to as "Parties". <br />WITNESSETH: <br />WHEREAS, AUTHORITY and CITY entered into Cooperative Agreement No. C-5-3583, dated <br />August 1, 2015 (the "Agreement), as last changed by Amendment No. 2 dated August 15, 2018 for <br />support of the design phase of the OC Streetcar, and <br />WHEREAS, the AUTHORITY and CITY agree that the AUTHORITY will provide the necessary <br />funds to acquire the specified properties necessary for construction and operation of OC Streetcar, and <br />WHEREAS, the AUTHORITY and CITY are jointly delivering the OC Streetcar project including <br />jointly acquiring property rights needed to construct the Maintenance and Storage Facility site; and <br />WHEREAS, AUTHORITY and CITY are in the process of acquiring three privately owned <br />parcels required for the design and construction of the Maintenance and Storage Facility site. The <br />design of the Maintenance and Storage Facility site shall also require the need for a portion of two <br />separate parcels located within the Pacific Electric Right of Way currently owned by AUTHORITY; and <br />Page 1 of 3 <br />L:tCommiCLERICAL1WGRDPROCWGREEWMENDW M353583.docc <br />
The URL can be used to link to this page
Your browser does not support the video tag.