My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - APPROVE PRE LOAN COMMITMENT_2019-01-15
Clerk
>
Agenda Packets / Staff Reports
>
Housing Authority (1999 - Present)
>
2019
>
01/15/2019_Special Mtg
>
3 - APPROVE PRE LOAN COMMITMENT_2019-01-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2019 9:37:42 AM
Creation date
1/16/2019 9:33:07 AM
Metadata
Fields
Template:
City Clerk
Agency
Community Development
Date
1/15/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Judson Brown, City of Santa Ana January 9, 2019 <br />Francis Xavier Residence: Preliminary Financial Gap Analysis Page 9 <br /> <br /> 1901007:SA:TRB <br /> 19090.017.010 <br /> <br />4. The NPLH Loan has a mandatory debt service payment equal to 0.42% of the <br />NPLH Loan amount, which equals $9,900 per year. <br />5. The replacement reserve deposits are set at $500 per unit per year, which is <br />required by the NPLH Program. <br />Estimated Stabilized Net Operating Income <br />The Project’s EGI is estimated at $142,600, and the operating expenses are estimated at <br />$88,300. This results in estimated stabilized net operating income of $54,300. <br />Financial Gap Calculation <br />The financial gap is estimated by deducting the available outside funding sources from <br />the Project’s total construction costs. The outside funding sources anticipated to be <br />received by the Project are described in the following sections of this memorandum. <br />Available Outside Funding Sources <br />Permanent Loan <br />To estimate the maximum permanent loan that can be supported by the Project’s NOI, <br />KMA assumed that the loan would be underwritten based on the following <br />requirements: <br />1. A 118% debt service coverage ratio; <br />2. A 6.15% interest rate; and <br />3. A 15-year amortization period. <br />KMA estimates that the Project’s stabilized NOI can support a $449,000 conventional <br />loan. <br />NPLH Loan <br />The Developer anticipates receiving a $2.35 million NPLH Loan. <br />EXHIBIT 3 <br />3-26
The URL can be used to link to this page
Your browser does not support the video tag.