Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO. 19-2703: JEROME CENTER <br />LANDSCAPE DRAINAGE PROJECT <br />Construction Contract <br />$ <br />83,155.00 <br />Contract Administration <br />$ <br />3,732.00 <br />Inspection and Testing <br />$ <br />4,800.00. <br />Contingencies <br />$ <br />8,313.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />100,000.00 <br />=:1:11 -iii! <br />23A-37 <br />